Sunset-Fontaine Connector: Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
(-current, some updates (article needs clean-up))
(6 intermediate revisions by 2 users not shown)
Line 3: Line 3:
| photo =Fontaine-sunset.jpg
| photo =Fontaine-sunset.jpg
| caption =
| caption =
| status ={{planned}}
| status ={{proposed}}
<!--ABOVE USE:{{proposed}},{{planned}},{{underway}},{{complete}},or {{canceled}} -->
<!--ABOVE USE:{{proposed}},{{planned}},{{underway}},{{complete}},or {{canceled}} -->
| meeting = [http://cvilletomorrow.typepad.com/charlottesville_tomorrow_/calendar.html?trumbaEmbed=view%3Devent%26eventid%3D95916731 November 15, 2011 Albemarle Planning Commission]
| meeting =  
| location =
| location = Albemarle
<!--ABOVE USE JURISDICTION: Albemarle, Charlottesville -->
<!--ABOVE USE JURISDICTION: Albemarle, Charlottesville -->
| cost =$12,800,000 (estimate)
| cost =$12,800,000 (estimate)
| sponsor =Albemarle
| sponsor = none {{as of|2018|9|lc=on}}
<!--ABOVE USE: Albemarle, Charlottesville, VDOT -->
<!--ABOVE USE: Albemarle, Charlottesville, VDOT -->
| purpose =Road interconnection between Fontaine Ave and Sunset Avenue/Old Lynchburg Road area in County. Expected alignment traverses the Granger Property and the UVA Fontaine Research Park. Cost includes bridge over railroad tracks.
| purpose =Road interconnection between Fontaine Ave and Sunset Avenue/Old Lynchburg Road area in County. Expected alignment traverses the Granger Property and the UVA Fontaine Research Park. Cost includes bridge over railroad tracks.
Line 18: Line 18:
}}
}}


The '''Fontaine/Sunset Connector''' is a proposed road to connect [[Fontaine Avenue]] in [[Charlottesville]] with Sunset Avenue/[[Old Lynchburg Road]] in [[Albemarle County]].  
The '''Fontaine/Sunset Connector''' is a proposed road to connect [[Fontaine Avenue]] in [[Charlottesville]] with Sunset Avenue/[[Old Lynchburg Road]] in [[Albemarle County]]. It is not under any serious consideration {{as of|2018|9|lc=on}}.  


== Project details ==
== Project details ==
Line 26: Line 26:


== Status ==
== Status ==
{{current}}
This project was called for in the [[Southern Urban Area B Study]]. Planning is currently{{when}} in the conceptual stage. The county, city and UVa are negotiating the alignment for this proposed connector. As such, the primary forum for negotiations is the [[Planning and Coordination Council]]. The [[Thomas Jefferson Planning District Commission]] is currently studying UVa's preferred alternative of running the road down [[Stribling Avenue]]. The study is expected to be ready in time for the November 18, 2010 PACC meeting<ref>Fitzgerald, Brendan. "C-Ville: UVA - Sunset/Fontaine Connector Gets New Study." C-VILLE Charlottesville's News & Arts Weekly | Charlottesville VA News Music Culture Dining. 31 Aug. 2010. Web. 31 Aug. 2010. <http://www.c-ville.com/index.php?cat=141404064432695&ShowArticle_ID=11803008103673232>.</ref>.
This project was called for in the [[Southern Urban Area B Study]]. Planning is currently{{when}} in the conceptual stage. The county, city and UVa are negotiating the alignment for this proposed connector. As such, the primary forum for negotiations is the [[Planning and Coordination Council]]. The [[Thomas Jefferson Planning District Commission]] is currently studying UVa's preferred alternative of running the road down [[Stribling Avenue]]. The study is expected to be ready in time for the November 18, 2010 PACC meeting<ref>Fitzgerald, Brendan. "C-Ville: UVA - Sunset/Fontaine Connector Gets New Study." C-VILLE Charlottesville's News & Arts Weekly | Charlottesville VA News Music Culture Dining. 31 Aug. 2010. Web. 31 Aug. 2010. <http://www.c-ville.com/index.php?cat=141404064432695&ShowArticle_ID=11803008103673232>.</ref>.


The project is currently priority #8 on the County's [[Albemarle County Secondary Six-Year Priority List| Six Year Plan for Secondary Roads for Fiscal Year 2009]]<ref>[http://www.albemarle.org/upload/images/Forms_Center/Departments/Board_of_Supervisors/Forms/Agenda/2008Files/20080312/SixYearRoadPlanAttachA1.pdf County's Strategic Priorites for Albemarle County Priority List for Secondary Road Improvements]</ref>. However, the project is also listed on the MPO's [[Transportation Improvement Program]] as an illustrative transportation project, which means it is not likely to begin receiving funding for some time<ref name=TIP>FY09-12 TRANSPORTATION IMPROVEMENT PROGRAM. Rep. [[Charlottesville-Albemarle Metropolitan Planning Organization]]. Web. 13 Oct. 2009. <http://www.tjpdc.org/pdf/TIP/FINAL_%20FY09%20TIP.pdf></ref>.
The project was at one point priority #8 on the County's [[Albemarle County Secondary Six-Year Priority List| Six Year Plan for Secondary Roads for Fiscal Year 2009]]<ref>[http://www.albemarle.org/upload/images/Forms_Center/Departments/Board_of_Supervisors/Forms/Agenda/2008Files/20080312/SixYearRoadPlanAttachA1.pdf County's Strategic Priorites for Albemarle County Priority List for Secondary Road Improvements]</ref>. However, the project is also listed on the MPO's [[Transportation Improvement Program]] as an illustrative transportation project, which means it is not likely to begin receiving funding for some time<ref name=TIP>FY09-12 TRANSPORTATION IMPROVEMENT PROGRAM. Rep. [[Charlottesville-Albemarle Metropolitan Planning Organization]]. Web. 13 Oct. 2009. <http://www.tjpdc.org/pdf/TIP/FINAL_%20FY09%20TIP.pdf></ref>.
 
At a December 18, 2012 Albemarle Planning Commission meeting, county staff said that the Sunset-Fontaine Connector wouldn't be completely built in the near future, but recommended the Commission continue securing the right of way and establish a bike/ped thoroughfare.  This recommendation is the result of the 2009-10 TJDPC traffic study, which showed that the Sunset-Fontaine Connector would not be used enough to necessitate building it<ref>{{cite web|title=Traffic model challenges benefits of Sunset-Fontaine Connector |url=http://www.cvilletomorrow.org/news/article/13697-sunset-fontaine-connector/ |author=Tim Shea |work=|publisher=Charlottesville Tomorrow |location=|publishdate=December 19, 2012 |accessdate=December 20, 2012}}</ref>.  


===Project history===
===Project history===
*May 19, 2009: At a PACC meeting, Leonard Sandridge says the University will not pay for off-site improvements as part of a rezoning effort<ref name=ctupdatedplans>Tubbs, Sean J. "County, City planners seeking updated plans for Fontaine-Sunset Connector; Sandridge says UVA will not contribute to road needs outside research park." Weblog post. Charlottesville Tomorrow News Center. Charlottesville Tomorrow, 17 July 2009. Web. 27 July 2009. <http://cvilletomorrow.typepad.com/charlottesville_tomorrow_/2009/07/fontaine_sunset_news.html>.</ref>
*May 19, 2009: At a PACC meeting, Leonard Sandridge says the University will not pay for off-site improvements as part of a rezoning effort<ref name=ctupdatedplans>Tubbs, Sean J. "County, City planners seeking updated plans for Fontaine-Sunset Connector; Sandridge says UVA will not contribute to road needs outside research park." Weblog post. Charlottesville Tomorrow News Center. Charlottesville Tomorrow, 17 July 2009. Web. 27 July 2009. <http://cvilletomorrow.typepad.com/charlottesville_tomorrow_/2009/07/fontaine_sunset_news.html>.</ref>
*July 16, 2009: At a [[PACC Tech]] meeting, County Planner Wayne Cilimberg says Charlottesville and Albemarle County would like the [[MPO Tech]] committee to discuss possible alignments for the road<ref name=ctupdatedplans/>.
*July 16, 2009: At a [[PACC Tech]] meeting, County Planner Wayne Cilimberg says Charlottesville and Albemarle County would like the [[MPO Tech]] committee to discuss possible alignments for the road<ref name=ctupdatedplans/>.
*2009-10: [[Thomas Jefferson Planning District Commission]] conducts traffic study as part of the [[Southern Urban Area B Study]].
*September 8, 2010: The road will come up during the Board of Supervisor's public hearing on the University of Virginia's request to rezone the [[Fontaine Research Park]].
*September 8, 2010: The road will come up during the Board of Supervisor's public hearing on the University of Virginia's request to rezone the [[Fontaine Research Park]].
*August 10, 2011: City Council candidates discuss road at [[Charlottesville City Council candidate forum, 2011 August 10 (2nd)|Fry's Spring Neighborhood association candidate forum]]. <ref>{{cite web|title=City council candidates debate Fontaine-Sunset Connector|url=http://cvilletomorrow.typepad.com/charlottesville_tomorrow_/2011/08/conn.html|author=Sean Tubbs|work=|publisher=Charlottesville Tomorrow|location=|publishdate=August 19, 2011|accessdate=October 14, 2011}}</ref>
*August 10, 2011: City Council candidates discuss road at [[Charlottesville City Council candidate forum, 2011 August 10 (2nd)|Fry's Spring Neighborhood association candidate forum]]. <ref>{{cite web|title=City council candidates debate Fontaine-Sunset Connector|url=http://cvilletomorrow.typepad.com/charlottesville_tomorrow_/2011/08/conn.html|author=Sean Tubbs|work=|publisher=Charlottesville Tomorrow|location=|publishdate=August 19, 2011|accessdate=October 14, 2011}}</ref>
 
*December 18, 2012: 2009-10 traffic modeling suggests that the road might not help as much as once thought<ref>{{cite web|title=Traffic model challenges benefits of Sunset-Fontaine Connector |url=http://www.cvilletomorrow.org/news/article/13697-sunset-fontaine-connector/ |author=Tim Shea |work=|publisher=Charlottesville Tomorrow |location=|publishdate=December 19, 2012 |accessdate=December 20, 2012}}</ref>.


==Map==
==Map==
Line 45: Line 47:


==References==
==References==
<references/>
{{reflist}}


[[Category: Transportation Improvement Program (TIP) items (illustrative)]]
[[Category: Transportation Improvement Program (TIP) items (illustrative)]]

Revision as of 23:37, 9 September 2018


Fontaine/Sunset Connector
Fontaine-sunset.jpg

Proposed

Project Overview

Road interconnection between Fontaine Ave and Sunset Avenue/Old Lynchburg Road area in County. Expected alignment traverses the Granger Property and the UVA Fontaine Research Park. Cost includes bridge over railroad tracks.
Cost $12,800,000 (estimate)
Location Albemarle
Sponsor none as of September 2018

Status Update

Part of Area B Study - The County, City and the University of Virginia continue to discuss the road, and most recently[when?] it was a topic of a PACC meeting.

Contact David Benish, Chief of Planning, Albemarle County

The Fontaine/Sunset Connector is a proposed road to connect Fontaine Avenue in Charlottesville with Sunset Avenue/Old Lynchburg Road in Albemarle County. It is not under any serious consideration as of September 2018.

Project details

The project was one of the recommendations of the Southern Urban Area B Study in September 2004. While the road is still in the conceptual stage, the expected alignment traverses the Granger property and the University of Virginia's Fontaine Research Park. The $12,800,000 project includes a bridge over railroad tracks.

A subdivision plat submitted to Albemarle County's community development department shows that Stribling Holdings LLC will build the portion of the connector on its property. A September 2010 rezoning for the Fontaine Research Park established that the University of Virginia Foundation will set aside land for a portion of the connector road. [1]

Status

This project was called for in the Southern Urban Area B Study. Planning is currently[when?] in the conceptual stage. The county, city and UVa are negotiating the alignment for this proposed connector. As such, the primary forum for negotiations is the Planning and Coordination Council. The Thomas Jefferson Planning District Commission is currently studying UVa's preferred alternative of running the road down Stribling Avenue. The study is expected to be ready in time for the November 18, 2010 PACC meeting[2].

The project was at one point priority #8 on the County's Six Year Plan for Secondary Roads for Fiscal Year 2009[3]. However, the project is also listed on the MPO's Transportation Improvement Program as an illustrative transportation project, which means it is not likely to begin receiving funding for some time[4].

At a December 18, 2012 Albemarle Planning Commission meeting, county staff said that the Sunset-Fontaine Connector wouldn't be completely built in the near future, but recommended the Commission continue securing the right of way and establish a bike/ped thoroughfare. This recommendation is the result of the 2009-10 TJDPC traffic study, which showed that the Sunset-Fontaine Connector would not be used enough to necessitate building it[5].

Project history

Map

References

  1. Web. Granger property to be developed by-right; connector road part of plans, Sean Tubbs, Charlottesville Tomorrow, November 15, 2011, retrieved November 15, 2011.
  2. Fitzgerald, Brendan. "C-Ville: UVA - Sunset/Fontaine Connector Gets New Study." C-VILLE Charlottesville's News & Arts Weekly | Charlottesville VA News Music Culture Dining. 31 Aug. 2010. Web. 31 Aug. 2010. <http://www.c-ville.com/index.php?cat=141404064432695&ShowArticle_ID=11803008103673232>.
  3. County's Strategic Priorites for Albemarle County Priority List for Secondary Road Improvements
  4. FY09-12 TRANSPORTATION IMPROVEMENT PROGRAM. Rep. Charlottesville-Albemarle Metropolitan Planning Organization. Web. 13 Oct. 2009. <http://www.tjpdc.org/pdf/TIP/FINAL_%20FY09%20TIP.pdf>
  5. Web. Traffic model challenges benefits of Sunset-Fontaine Connector, Tim Shea, Charlottesville Tomorrow, December 19, 2012, retrieved December 20, 2012.
  6. 6.0 6.1 Tubbs, Sean J. "County, City planners seeking updated plans for Fontaine-Sunset Connector; Sandridge says UVA will not contribute to road needs outside research park." Weblog post. Charlottesville Tomorrow News Center. Charlottesville Tomorrow, 17 July 2009. Web. 27 July 2009. <http://cvilletomorrow.typepad.com/charlottesville_tomorrow_/2009/07/fontaine_sunset_news.html>.
  7. Web. City council candidates debate Fontaine-Sunset Connector, Sean Tubbs, Charlottesville Tomorrow, August 19, 2011, retrieved October 14, 2011.
  8. Web. Traffic model challenges benefits of Sunset-Fontaine Connector, Tim Shea, Charlottesville Tomorrow, December 19, 2012, retrieved December 20, 2012.