Schnabel Engineering Associates

From Cvillepedia
Revision as of 21:21, 22 September 2009 by 1099047208 (talk | contribs) (New page: {{stub}} Schnabel Engineering Associates was retained in September 2009 by the Rivanna Water and Sewer Authority to prepare a preliminary design for the new Ragged Mountain Dam...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search


Logo-small25.jpg This article is a stub. You can help cvillepedia by expanding it.

Schnabel Engineering Associates was retained in September 2009 by the Rivanna Water and Sewer Authority to prepare a preliminary design for the new Ragged Mountain Dam. The firm replaces Gannett Fleming which worked during 2007-2008 on the preliminary dam design and geotechnical research before the project was temporarily halted in August 2008.[1]

Chris Webster is a Principal of the firm and will serve as the Project Administrator. Webster works in the firm's Charlottesville office.[2]

External Links

official website

  1. Will link to story being published tomorrow
  2. "Interview with Chris Webster, Principal, Schnabel Engineering Associates." Personal interview by Brian A. Wheeler. Charlottesville Tomorrow. 22 September 2009.