[[Schnabel Engineering Associates]] was retained in September 2009 by the [[Rivanna Water and Sewer Authority]] to prepare a preliminary design for the new [[Ragged Mountain Dam]]. The firm replaces [[Gannett Fleming]] which worked during 2007-2008 on the preliminary dam design and geotechnical research before the project was temporarily halted in August 2008.<ref>Wheeler, Brian A. Charlottesville Tomorrow News Center. Charlottesville Tomorrow, 23 Sept. 2009. Web. 23 Sept. 2009. <http://cvilletomorrow.typepad.com/charlottesville_tomorrow_/2009/09/schnabel.html>.</ref>
[[Schnabel Engineering Associates]] was retained in September 2009 by the [[Rivanna Water and Sewer Authority]] to prepare a preliminary design for the new [[Ragged Mountain Dam]]. This contract was worth $1.3 million. The firm replaces [[Gannett Fleming]] which worked during 2007-2008 on the preliminary dam design and geotechnical research before the project was temporarily halted in August 2008.<ref>Wheeler, Brian A. Charlottesville Tomorrow News Center. Charlottesville Tomorrow, 23 Sept. 2009. Web. 23 Sept. 2009. <http://cvilletomorrow.typepad.com/charlottesville_tomorrow_/2009/09/schnabel.html>.</ref>


[[Chris Webster]] is a Principal of the firm and will serve as the Project Administrator.  Webster works in the firm's Charlottesville office.<ref>"Interview with Chris Webster, Principal, Schnabel Engineering Associates." Personal interview by Brian A. Wheeler. Charlottesville Tomorrow. 22 September 2009.</ref>
[[Chris Webster]] is a Principal of the firm and will serve as the Project Administrator.  Webster works in the firm's Charlottesville office.<ref>"Interview with Chris Webster, Principal, Schnabel Engineering Associates." Personal interview by Brian A. Wheeler. Charlottesville Tomorrow. 22 September 2009.</ref>

Revision as of 16:19, 25 September 2009


Logo-small25.jpg This article is a stub. You can help cvillepedia by expanding it.

Schnabel Engineering Associates was retained in September 2009 by the Rivanna Water and Sewer Authority to prepare a preliminary design for the new Ragged Mountain Dam. This contract was worth $1.3 million. The firm replaces Gannett Fleming which worked during 2007-2008 on the preliminary dam design and geotechnical research before the project was temporarily halted in August 2008.[1]

Chris Webster is a Principal of the firm and will serve as the Project Administrator. Webster works in the firm's Charlottesville office.[2]

External Links

official website

Notes

  1. Wheeler, Brian A. Charlottesville Tomorrow News Center. Charlottesville Tomorrow, 23 Sept. 2009. Web. 23 Sept. 2009. <http://cvilletomorrow.typepad.com/charlottesville_tomorrow_/2009/09/schnabel.html>.
  2. "Interview with Chris Webster, Principal, Schnabel Engineering Associates." Personal interview by Brian A. Wheeler. Charlottesville Tomorrow. 22 September 2009.