Schnabel Engineering Associates: Difference between revisions
Jump to navigation
Jump to search
1099047208 (talk | contribs) No edit summary |
1099047208 (talk | contribs) m (adding ref) |
||
Line 1: | Line 1: | ||
{{stub}} | {{stub}} | ||
[[Schnabel Engineering Associates]] was retained in September 2009 by the [[Rivanna Water and Sewer Authority]] to prepare a preliminary design for the new [[Ragged Mountain Dam]]. The firm replaces [[Gannett Fleming]] which worked during 2007-2008 on the preliminary dam design and geotechnical research before the project was temporarily halted in August 2008.<ref> | [[Schnabel Engineering Associates]] was retained in September 2009 by the [[Rivanna Water and Sewer Authority]] to prepare a preliminary design for the new [[Ragged Mountain Dam]]. The firm replaces [[Gannett Fleming]] which worked during 2007-2008 on the preliminary dam design and geotechnical research before the project was temporarily halted in August 2008.<ref>Wheeler, Brian A. Charlottesville Tomorrow News Center. Charlottesville Tomorrow, 23 Sept. 2009. Web. 23 Sept. 2009. <http://cvilletomorrow.typepad.com/charlottesville_tomorrow_/2009/09/schnabel.html>.</ref> | ||
[[Chris Webster]] is a Principal of the firm and will serve as the Project Administrator. Webster works in the firm's Charlottesville office.<ref>"Interview with Chris Webster, Principal, Schnabel Engineering Associates." Personal interview by Brian A. Wheeler. Charlottesville Tomorrow. 22 September 2009.</ref> | [[Chris Webster]] is a Principal of the firm and will serve as the Project Administrator. Webster works in the firm's Charlottesville office.<ref>"Interview with Chris Webster, Principal, Schnabel Engineering Associates." Personal interview by Brian A. Wheeler. Charlottesville Tomorrow. 22 September 2009.</ref> |
Revision as of 00:05, 23 September 2009
This article is a stub. You can help cvillepedia by expanding it. |
Schnabel Engineering Associates was retained in September 2009 by the Rivanna Water and Sewer Authority to prepare a preliminary design for the new Ragged Mountain Dam. The firm replaces Gannett Fleming which worked during 2007-2008 on the preliminary dam design and geotechnical research before the project was temporarily halted in August 2008.[1]
Chris Webster is a Principal of the firm and will serve as the Project Administrator. Webster works in the firm's Charlottesville office.[2]
External Links
Notes
- ↑ Wheeler, Brian A. Charlottesville Tomorrow News Center. Charlottesville Tomorrow, 23 Sept. 2009. Web. 23 Sept. 2009. <http://cvilletomorrow.typepad.com/charlottesville_tomorrow_/2009/09/schnabel.html>.
- ↑ "Interview with Chris Webster, Principal, Schnabel Engineering Associates." Personal interview by Brian A. Wheeler. Charlottesville Tomorrow. 22 September 2009.