Schnabel Engineering Associates: Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
(New page: {{stub}} Schnabel Engineering Associates was retained in September 2009 by the Rivanna Water and Sewer Authority to prepare a preliminary design for the new Ragged Mountain Dam...)
 
No edit summary
Line 5: Line 5:


==External Links==
==External Links==
[http://www.schnabel-eng.com/ official website]


[http://www.schnabel-eng.com/ official website]
==Notes==
<references/>


[[Category: Water supply]]
[[Category: Water supply]]
[[Category: Government consulting firms]]
[[Category: Government consulting firms]]

Revision as of 21:21, 22 September 2009


Logo-small25.jpg This article is a stub. You can help cvillepedia by expanding it.

Schnabel Engineering Associates was retained in September 2009 by the Rivanna Water and Sewer Authority to prepare a preliminary design for the new Ragged Mountain Dam. The firm replaces Gannett Fleming which worked during 2007-2008 on the preliminary dam design and geotechnical research before the project was temporarily halted in August 2008.[1]

Chris Webster is a Principal of the firm and will serve as the Project Administrator. Webster works in the firm's Charlottesville office.[2]

External Links

official website

Notes

  1. Will link to story being published tomorrow