Schnabel Engineering Associates: Difference between revisions
Jump to navigation
Jump to search
1099047208 (talk | contribs) (New page: {{stub}} Schnabel Engineering Associates was retained in September 2009 by the Rivanna Water and Sewer Authority to prepare a preliminary design for the new Ragged Mountain Dam...) |
1099047208 (talk | contribs) No edit summary |
||
Line 5: | Line 5: | ||
==External Links== | ==External Links== | ||
[http://www.schnabel-eng.com/ official website] | |||
==Notes== | |||
<references/> | |||
[[Category: Water supply]] | [[Category: Water supply]] | ||
[[Category: Government consulting firms]] | [[Category: Government consulting firms]] |
Revision as of 21:21, 22 September 2009
This article is a stub. You can help cvillepedia by expanding it. |
Schnabel Engineering Associates was retained in September 2009 by the Rivanna Water and Sewer Authority to prepare a preliminary design for the new Ragged Mountain Dam. The firm replaces Gannett Fleming which worked during 2007-2008 on the preliminary dam design and geotechnical research before the project was temporarily halted in August 2008.[1]
Chris Webster is a Principal of the firm and will serve as the Project Administrator. Webster works in the firm's Charlottesville office.[2]