[[Schnabel Engineering Associates]] is an engineering firm involved in area water-supply projects. | |||
[[Schnabel Engineering Associates]] | |||
[[Chris Webster | Schnabel was retained in September 2009 by the [[Rivanna Water and Sewer Authority]] to prepare a preliminary design for the new [[Ragged Mountain Dam]]. This contract was worth $1.3 million. The firm replaces [[Gannett Fleming]], which worked during 2007-2008 on the preliminary dam design and geotechnical research before the project was temporarily halted in August 2008.<ref>{{cite web|author=Wheeler, Brian A.|work=Charlottesville Tomorrow News Center|publisher=Charlottesville Tomorrow|publishdate=23 Sept. 2009|accessdate=23 Sept. 2009|url=http://cvilletomorrow.typepad.com/charlottesville_tomorrow_/2009/09/schnabel.html|title=Engineering firm with local ties hired to design new Ragged Mountain Dam}}</ref> | ||
Schnabel may also be retained to prepare a cost estimate for raising the [[Ragged Mountain Dam]], an option [[City Council]] has asked be studied<ref name=dpfirstphase>{{cite-progress|url=http://www2.dailyprogress.com/cdp/news/local/article/engineer_1st_phase_of_dam_study_would_cost_188803/51081/|author=Staff report|title=Engineer: 1st phase of dam study would cost $188,803|publishdate=Jan 16 2010}}</ref>. | |||
Chris Webster is a principal of the firm and will serve as the Project Administrator. Webster works in the firm's Charlottesville office<ref>"Interview with Chris Webster, Principal, Schnabel Engineering Associates." Personal interview by Brian A. Wheeler. Charlottesville Tomorrow. 22 September 2009.</ref>. | |||
==References== | |||
<references/> | |||
==External Links== | ==External Links== | ||
[http://www.schnabel-eng.com/ official website] | [http://www.schnabel-eng.com/ official website] | ||
[[Category: Water supply]] | [[Category: Water supply]] | ||
[[Category: Government consulting firms]] | [[Category: Government consulting firms]] |
Revision as of 16:50, 18 January 2010
Schnabel Engineering Associates is an engineering firm involved in area water-supply projects.
Schnabel was retained in September 2009 by the Rivanna Water and Sewer Authority to prepare a preliminary design for the new Ragged Mountain Dam. This contract was worth $1.3 million. The firm replaces Gannett Fleming, which worked during 2007-2008 on the preliminary dam design and geotechnical research before the project was temporarily halted in August 2008.[1]
Schnabel may also be retained to prepare a cost estimate for raising the Ragged Mountain Dam, an option City Council has asked be studied[2].
Chris Webster is a principal of the firm and will serve as the Project Administrator. Webster works in the firm's Charlottesville office[3].
References
- ↑ Web. Engineering firm with local ties hired to design new Ragged Mountain Dam, Wheeler, Brian A., Charlottesville Tomorrow News Center, Charlottesville Tomorrow, 23 Sept. 2009, retrieved 23 Sept. 2009.
- ↑ Web. Engineer: 1st phase of dam study would cost $188,803, Staff report, Daily Progress, Lee Enterprises, Jan 16 2010
- ↑ "Interview with Chris Webster, Principal, Schnabel Engineering Associates." Personal interview by Brian A. Wheeler. Charlottesville Tomorrow. 22 September 2009.