Line 1: Line 1:
{{Infobox Transportation
 
| name = Sample Highway
| photo = 3rdStConstruction.jpg
| caption = The project is underway
| status = {{canceled}}<!--USE:{{planned}}, {{underway}}, {{complete}}, or {{canceled}} -->
| meeting = Sept. 1, 2029 Public Hearing
| location = Albemarle
| cost = $1,000,000
| sponsor = [[Albemarle County]]
| purpose = The purpose of the Sample Highway is to:
#Provide for traffic flow between A and B
#Ease congestion on A, This Street, That Road, and Parkway
| status-desc = The Eastern Connector Corridor Location study has finished its work. The steering committee recommended an alignment that would connect Rio Road with Route 20 via Pen Park. The committee also recommended that two other alternatives (Polo Grounds Road and a relocation of Proffit Road) be reserved now for development as roads in the near future. However, both the Board of Supervisors and the City Council have both opted to delay further consideration on the road until further traffic data can be obtained to prove the need for the road.
| website = [http://www.albemarle.org/department.asp?department=planning&relpage=9606 Project website]
| vdot-dashboard = test
| contact = [[Juan Wade]], Transportation Planner, Albemarle County
}}{{stub}}
==Map==
{{#widget:Google Maps
|key=ABQIAAAAojBY5tzU0lNaaG1NR11yGBQuKIzZ79u58OXcOlLN1k3VUdgk4hQ8nlpg30TDT_dNcrCg3U2s-aQ5eg
|lat=38.038695
|lng=-78.619366
|zoom=14
|width=350
|height=350
|centermarker=no
|maptypecontrol=yes
|smallmapcontrol=yes
}}

Latest revision as of 21:19, 7 July 2009