Route 20 / Route 649 Roundabout: Difference between revisions
Jump to navigation
Jump to search
(created (needs details) |
(more details) |
||
Line 2: | Line 2: | ||
Curtis Consulting of West Point was awarded a $28.5 million contract by the [[Commonwealth Transportation Board]] at their meeting on [[July 19]], [[2019]]. <ref>{{cite web|title=Albemarle County Design-Build Projects|url=https://www.virginiadot.org/projects/culpeper/albdesignbuild.asp|author=|work=Website|publisher=Virginia Department of Transportation|location=|publishdate=|accessdate=August 17, 2019}}</ref> | Curtis Consulting of West Point was awarded a $28.5 million contract by the [[Commonwealth Transportation Board]] at their meeting on [[July 19]], [[2019]]. <ref>{{cite web|title=Albemarle County Design-Build Projects|url=https://www.virginiadot.org/projects/culpeper/albdesignbuild.asp|author=|work=Website|publisher=Virginia Department of Transportation|location=|publishdate=|accessdate=August 17, 2019}}</ref> | ||
The total project cost is $4 million. Engineering is budgeted at $700,000, right of way is budgeted at $1 million and construction is budgeted at $2.3 million. | |||
{{clear}} | {{clear}} | ||
Line 12: | Line 14: | ||
==References== | ==References== | ||
{{reflist}} | {{reflist}} | ||
==External Links== | ==External Links== | ||
*[https://www.virginiadot.org/projects/culpeper/albdesignbuild.asp VDOT project site] | *[https://www.virginiadot.org/projects/culpeper/albdesignbuild.asp VDOT project site] | ||
*[https://smartportal.virginiahb2.org/#/public/applications/2018/hb2/view/F2-0000001403-R02 Smart Scale Application] | |||
*[https://paptprd.blob.core.windows.net/scorecards/F2-0000001403-R02.PDF Smart Scale Scorecard] |
Revision as of 22:27, 17 August 2019
The Route 20 / Route 649 Roundabout is a planned transportation improvement planned by the Virginia Department of Transportation that is one of six Albemarle County Design-Build Projects combined into one contract.
Curtis Consulting of West Point was awarded a $28.5 million contract by the Commonwealth Transportation Board at their meeting on July 19, 2019. [1]
The total project cost is $4 million. Engineering is budgeted at $700,000, right of way is budgeted at $1 million and construction is budgeted at $2.3 million.
Timeline
- July 19, 2019: CTB award scheduled as part of larger design-build project
This Transportation-related article is a stub. You can help cvillepedia by expanding it. |
References
- ↑ Web. Albemarle County Design-Build Projects, Website, Virginia Department of Transportation, retrieved August 17, 2019.