Route 20 / Route 649 Roundabout: Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
(created (needs details)
 
(more details)
Line 2: Line 2:


Curtis Consulting of West Point was awarded a $28.5 million contract by the [[Commonwealth Transportation Board]] at their meeting on [[July 19]], [[2019]]. <ref>{{cite web|title=Albemarle County Design-Build Projects|url=https://www.virginiadot.org/projects/culpeper/albdesignbuild.asp|author=|work=Website|publisher=Virginia Department of Transportation|location=|publishdate=|accessdate=August 17, 2019}}</ref>
Curtis Consulting of West Point was awarded a $28.5 million contract by the [[Commonwealth Transportation Board]] at their meeting on [[July 19]], [[2019]]. <ref>{{cite web|title=Albemarle County Design-Build Projects|url=https://www.virginiadot.org/projects/culpeper/albdesignbuild.asp|author=|work=Website|publisher=Virginia Department of Transportation|location=|publishdate=|accessdate=August 17, 2019}}</ref>
The total project cost is $4 million. Engineering is budgeted at $700,000, right of way is budgeted at $1 million and construction is budgeted at $2.3 million.


{{clear}}
{{clear}}
Line 12: Line 14:
==References==
==References==
{{reflist}}
{{reflist}}


==External Links==
==External Links==
*[https://www.virginiadot.org/projects/culpeper/albdesignbuild.asp VDOT project site]
*[https://www.virginiadot.org/projects/culpeper/albdesignbuild.asp VDOT project site]
*[https://smartportal.virginiahb2.org/#/public/applications/2018/hb2/view/F2-0000001403-R02 Smart Scale Application]
*[https://paptprd.blob.core.windows.net/scorecards/F2-0000001403-R02.PDF Smart Scale Scorecard]

Revision as of 22:27, 17 August 2019

The Route 20 / Route 649 Roundabout is a planned transportation improvement planned by the Virginia Department of Transportation that is one of six Albemarle County Design-Build Projects combined into one contract.

Curtis Consulting of West Point was awarded a $28.5 million contract by the Commonwealth Transportation Board at their meeting on July 19, 2019. [1]

The total project cost is $4 million. Engineering is budgeted at $700,000, right of way is budgeted at $1 million and construction is budgeted at $2.3 million.

Timeline

  • July 19, 2019: CTB award scheduled as part of larger design-build project


Streetcar-photo-sim.jpg This Transportation-related article is a stub. You can help cvillepedia by expanding it.

References

  1. Web. Albemarle County Design-Build Projects, Website, Virginia Department of Transportation, retrieved August 17, 2019.