Rio Mills Road/Berkmar Drive Connection: Difference between revisions
(created (needs info) |
(fixed name of curtis) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
The {{PAGENAME}} is a planned transportation improvement planned by the [[Virginia Department of Transportation]] that is one of six [[Albemarle County Design-Build Projects]] combined into one contract. | The {{PAGENAME}} is a planned transportation improvement planned by the [[Virginia Department of Transportation]] that is one of six [[Albemarle County Design-Build Projects]] combined into one contract. | ||
Curtis | [[Curtis Contracting]] of West Point was awarded a $28.5 million contract by the [[Commonwealth Transportation Board]] at their meeting on [[July 19]], [[2019]]. <ref>{{cite web|title=Albemarle County Design-Build Projects|url=https://www.virginiadot.org/projects/culpeper/albdesignbuild.asp|author=|work=Website|publisher=Virginia Department of Transportation|location=|publishdate=|accessdate=August 17, 2019}}</ref> | ||
The project has a total budget of $3.8 million. Engineering is budgeted at $850,000, right of way is budgeted at $500,000 and construction is budgeted at $2.45 million. | |||
==Project purpose== | |||
"This project will construct a quarter-mile, two-lane road to connect Rio Mills Road to the recently completed Berkmar Drive Extended. The work will include a sidewalk and shared-use path that connects to the bicycle and pedestrian facilities on Berkmar Drive Extended." | |||
{{clear}} | {{clear}} | ||
==Timeline== | ==Timeline== | ||
*July 19, 2019 | *[[July 19]], [[2019]] – CTB award scheduled as part of larger design-build project | ||
{{transport-stub}} | {{transport-stub}} | ||
Line 15: | Line 21: | ||
==External Links== | ==External Links== | ||
*[https://www.virginiadot.org/projects/culpeper/albdesignbuild.asp VDOT project site] | *[https://www.virginiadot.org/projects/culpeper/albdesignbuild.asp VDOT project site] | ||
*[https://smartportal.virginiahb2.org/#/public/applications/2018/hb2/view/F2-0000001408-R02 Smart Scale Application] | |||
*[https://paptprd.blob.core.windows.net/scorecards/F2-0000001408-R02.PDF Smart Scale Scorecard] |
Latest revision as of 18:54, 12 September 2022
The Rio Mills Road/Berkmar Drive Connection is a planned transportation improvement planned by the Virginia Department of Transportation that is one of six Albemarle County Design-Build Projects combined into one contract.
Curtis Contracting of West Point was awarded a $28.5 million contract by the Commonwealth Transportation Board at their meeting on July 19, 2019. [1]
The project has a total budget of $3.8 million. Engineering is budgeted at $850,000, right of way is budgeted at $500,000 and construction is budgeted at $2.45 million.
Project purpose
"This project will construct a quarter-mile, two-lane road to connect Rio Mills Road to the recently completed Berkmar Drive Extended. The work will include a sidewalk and shared-use path that connects to the bicycle and pedestrian facilities on Berkmar Drive Extended."
Timeline
This Transportation-related article is a stub. You can help cvillepedia by expanding it. |
References
- ↑ Web. Albemarle County Design-Build Projects, Website, Virginia Department of Transportation, retrieved August 17, 2019.