Northside Material Recovery Facility

From Cvillepedia
Revision as of 11:43, 17 August 2019 by Seantubbs (talk | contribs) (created)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

The Northside Material Recovery Facility is a planned operation being built in Albemarle County's northern urban area.

According to the narrative of operations in the site plan, "the site shall be used to process recycled asphalt and concrete materials to include: inert concrete, asphalt, gravel & debris associated with the recycling of concrete and asphalt products such as rebar. The site will not be used to process recycled paper, glass, plastic electronics, or any other material not specified above."

Documentation

The site development plan is SDP201800067.



Logo-small25.jpg This article is a stub. You can help cvillepedia by expanding it.


References


External Links