Meadow Creek Parkway (County portion): Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
No edit summary
No edit summary
Line 17: Line 17:


== Status ==
== Status ==
== Other components ==
[[McIntire Road Extended (City's Portion of Meadowcreek Pkwy)]]
[[Meadowcreek Parkway Interchange]]


[[Category: Transportation Matrix]]
[[Category: Transportation Matrix]]

Revision as of 15:05, 28 December 2007

<googlemap lat="38.042740" lon="-78.474930" zoom="14" controls="large" width="300">

  1. 00ff00
  2. 00ff00

38.049670,-78.471210 38.053194,-78.469162 38.062380,-78.461860</googlemap>


Project Details

The project is currently one of three road constructions projects that are currently accruing funds from the Virginia Department of Transportation's secondary road funding mechanism. It is planned to be a 1.3 mile long Meadow Creek Parkway, running from Melbourne Road to Route 631 – Rio Road.


History

The Virginia Department of Transportation held an open design public hearing on March 20, 2003. 5 – 7 p.m. This is the second phase of the Meadowcreek Parkway Project. It runs north around the Charlottesville High School athletic facilities and continues parallel with the railroad tracks. After crossing Meadow Creek, the road shifts to the east around the Charlottesville-Albemarle Technical School (CATEC) and joins the existing Rio Road.

Status

Other components

McIntire Road Extended (City's Portion of Meadowcreek Pkwy)

Meadowcreek Parkway Interchange