Meadow Creek Parkway (County portion): Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
(Redirected page to John Warner Parkway)
 
(31 intermediate revisions by 6 users not shown)
Line 1: Line 1:
{{Infobox Transportation
#REDIRECT [[John Warner Parkway]]
| name =Meadowcreek Parkway
| photo =Mcp-county.jpg
| caption =
| status ={{underway}}
<!--ABOVE USE:{{proposed}},{{planned}},{{underway}},{{complete}},or {{canceled}} -->
| meeting =
| location =
<!--ABOVE USE JURISDICTION: Albemarle, Charlottesville -->
| cost =$30,590,522 - County applying for VDOT Revenue Sharing in FY2009 to cover balance
| sponsor =VDOT
<!--ABOVE USE: Albemarle, Charlottesville, VDOT -->
| purpose =1. Improve traffic flow between Rio Road (Route 631) and Route 250 <br>2. Provide more direct access to and from the Charlottesville downtown area
| status-desc =This is Albemarle County's portion of the project. A contract was awarded to Faulconer Construction Company, Inc. on December 18, 2008 by the [[Commonwealth Transportation Board]] for $11.8 million. Construction will begin in February 2009, with completion in the fall of 2011. Roadway to open in spring of 2012, pending completion of McIntire Road Extended and 250 Interchange.
| website =
| vdot-dashboard =[http://dashboard.virginiadot.org/Pages/Projects/EngineeringDetailDesign.aspx?prj_nbr=2530 VDOT Dashboard Entry]
| contact =[[Greg Krystyniak]], Project Manager, Location & Design Section, VDOT Culpeper District
}}
==Map==
{{Map|lat=38.056506|lng=-78.46839|zoom=15}}
 
== Project Details ==
The county portion is one of three parts of the [[Meadowcreek Parkway]], currently under construction, with an anticipated completion date of October 2011.
 
When complete, this portion of the parkway will be 1.3 miles long, running from [[Melbourne Road]] to East [[Rio Road]]. It will run north around the [[Charlottesville High School]] athletic facilities and continue parallel with the railroad tracks. After crossing [[Meadow Creek]], the road will shift to the east around the [[Charlottesville Albemarle Technical Education Center]] {CATEC} and join Rio Road just south of the school.
 
== History ==
The [[Virginia Department of Transportation]] held an open design public hearing on March 20, 2003. An $11.8 million bid for construction was awarded to the [[Faulconer Construction Company]] in December 2007. 
 
==Construction==
On July 6 2009, the county announced that 12% of the construction was completed<ref name=cttwelvepercent>[http://cvilletomorrow.typepad.com/charlottesville_tomorrow_/2009/07/county_meadowcreek_update.html VDOT: County’s portion of Meadowcreek Parkway on schedule], Sean Tubbs, Charlottesville Tomorrow, 6 Jul 2009.</ref>.
 
==Other components of the Meadowcreek Parkway==
The larger parkway project includes two other phases, both in the city:
*[[McIntire Road Extended]], and
*the [[Meadowcreek Parkway Interchange]].
 