Meadow Creek Parkway (County portion): Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
(only article in non-existent cat; I think this is the cat that was meant. also some other cleanup.)
(Redirected page to John Warner Parkway)
 
(37 intermediate revisions by 7 users not shown)
Line 1: Line 1:
[[Image:Mcp-county.jpg|right|180px]]
#REDIRECT [[John Warner Parkway]]
 
The county portion is one of three parts of the [[Meadowcreek Parkway]], currently under construction, with an anticipated completion date of October 2011.
 
== Project Details ==
When complete, this portion of the parkway will be 1.3 miles long, running from [[Melbourne Road]] to East [[Rio Road]]. It will run north around the [[Charlottesville High School]] athletic facilities and continue parallel with the railroad tracks. After crossing [[Meadow Creek]], the road will shift to the east around the [[Charlottesville-Albemarle Technical Education Center]] {CATEC} and join Rio Road just south of the school.
 
== History ==
The [[Virginia Department of Transportation]] held an open design public hearing on March 20, 2003. An $11.8 million bid for construction was awarded to the [[Faulconer Construction Company]] in December 2007. 
 
==Other components of the Meadowcreek Parkway==
The larger parkway project includes two other phases:
*[[McIntire Road Extended (City's Portion of Meadowcreek Pkwy)]], and
*the [[Meadowcreek Parkway Interchange]].
 
== External Links ==
[http://maps.google.com/maps/ms?ie=UTF8&hl=en&om=1&msa=0&msid=109686697319922348715.00043c1300be673f805ba&ll=38.055661,-78.465729&spn=0.027574,0.058365&t=h&z=14 Google Map of Meadowcreek Parkway (County portion)]
 
[[Category: Transportation Matrix]]
[[Category: Road Projects]]

Latest revision as of 18:44, 30 September 2014