List of water supply studies
Jump to navigation
Jump to search
Key studies related to the Charlottesville-Albemarle Community Water Supply
Safe Yield Study by Gannett Fleming, January 2004
This report documents a safe yield of 13.3 MGD (revised downward in July 2004 report)
Demand Analysis for the Urban Service Area by Gannett Fleming, May 2004
It estimates the demand in 2055 to be 18.7 MGD with 5% conservation measures.
Water Supply Alternatives Supplemental Evaluation by Gannett Fleming, July 2004
This report documents the downward adjustment of current safe yield from 13.3 MGD to 12.8 MGD (2002).
It projects the safe yield in 2055 to be 8.8 MGD.
It identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD).