List of water supply studies

From Cvillepedia
Revision as of 22:26, 22 February 2009 by 1099047208 (talk | contribs)
Jump to navigation Jump to search

Key studies related to the Charlottesville-Albemarle Community Water Supply

Safe Yield Study by Gannett Fleming, January 2004

This report documents a safe yield of 13.3 MGD (revised downward in July 2004 report)

Demand Analysis for the Urban Service Area by Gannett Fleming, May 2004

It estimates the demand in 2055 to be 18.7 MGD.

Water Supply Alternatives Supplemental Evaluation by Gannett Fleming, July 2004

This report documents the downward adjustment of current safe yield from 13.3 MGD to 12.8 MGD (2002).

It projects the safe yield in 2055 to be 8.8 MGD.

It identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD).