List of water supply studies: Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
m (cat (this page is a little gnarly, which I'm ignoring...))
Line 36: Line 36:


[[Category: Water supply]]
[[Category: Water supply]]
[[Category:Planning studies]]

Revision as of 14:21, 14 July 2009

Government Studies

Key governmental studies related to the Charlottesville-Albemarle Community Water Supply Plan

Raw Water Supply Demand Analysis by Vanasse Hangen Brustlin, October 1997

  • This report recommends planning for water supply demand in 2050 to be between 18 MGD and 21 MGD.

Safe Yield Study by Gannett Fleming, January 2004

  • This report documents a safe yield of 13.3 MGD (revised downward in July 2004 report)

Demand Analysis for the Urban Service Area by Gannett Fleming, May 2004

  • This report recommends planning for water supply demand in 2055 to be 18.7 MGD with 5% conservation measures.

Water Supply Alternatives Supplemental Evaluation by Gannett Fleming, July 2004

  • This report documents the downward adjustment of current safe yield from 13.3 MGD to 12.8 MGD (2002).
  • It identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD).

Community Water Supply Project Joint Permit Application, by Gannett Fleming & Vanasse Hangen Brustlin for Rivanna Water & Sewer Authority, June 30, 2006

Community Water Supply Project Permit Support Document, by Gannett Fleming & Vanasse Hangen Brustlin for Rivanna Water & Sewer Authority, June 30, 2006

Ragged Mountain Dam, Independent Technical Review Team Report

  • Released to public on June 2, 2009
  • Study commissioned by RWSA to address variance in engineering plans and cost estimates for the new Ragged Mountain Dam

Independent Studies

Gahagan & Bryant dredging assessment, May 2008