List of water supply studies: Difference between revisions
Jump to navigation
Jump to search
1099047208 (talk | contribs) |
1099047208 (talk | contribs) No edit summary |
||
Line 21: | Line 21: | ||
* It identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD). | * It identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD). | ||
[http://www.cvilletomorrow.org/docs/20090406-RM-Dam-ITRT-Report.pdf Ragged Mountain Dam, Independent Technical Review Team Report] | |||
* Released to public on June 2, 2009 | |||
* Study commissioned by RWSA to address variance in engineering plans and cost estimates for the new Ragged Mountain Dam | |||
==Independent Studies== | ==Independent Studies== |
Revision as of 13:18, 2 June 2009
Government Studies
Key governmental studies related to the Charlottesville-Albemarle Community Water Supply Plan
Raw Water Supply Demand Analysis by Vanasse Hangen Brustlin, October 1997
- This report recommends planning for water supply demand in 2050 to be between 18 MGD and 21 MGD.
Safe Yield Study by Gannett Fleming, January 2004
- This report documents a safe yield of 13.3 MGD (revised downward in July 2004 report)
Demand Analysis for the Urban Service Area by Gannett Fleming, May 2004
- This report recommends planning for water supply demand in 2055 to be 18.7 MGD with 5% conservation measures.
Water Supply Alternatives Supplemental Evaluation by Gannett Fleming, July 2004
- This report documents the downward adjustment of current safe yield from 13.3 MGD to 12.8 MGD (2002).
- It projects the safe yield in 2055 to be 8.8 MGD.
- It identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD).
Ragged Mountain Dam, Independent Technical Review Team Report
- Released to public on June 2, 2009
- Study commissioned by RWSA to address variance in engineering plans and cost estimates for the new Ragged Mountain Dam
Independent Studies
Gahagan & Bryant dredging assessment, May 2008