List of water supply studies: Difference between revisions
Jump to navigation
Jump to search
1099047208 (talk | contribs) No edit summary |
1099047208 (talk | contribs) No edit summary |
||
Line 7: | Line 7: | ||
[http://www.cvilletomorrow.org/docs/water/200405-GF-DemandAnalysis.pdf Demand Analysis for the Urban Service Area] by Gannett Fleming, May 2004 | [http://www.cvilletomorrow.org/docs/water/200405-GF-DemandAnalysis.pdf Demand Analysis for the Urban Service Area] by Gannett Fleming, May 2004 | ||
It estimates the demand in 2055 to be 18.7 MGD. | It estimates the demand in 2055 to be 18.7 MGD with 5% conservation measures. | ||
[http://www.cvilletomorrow.org/docs/water/200407-watersupplyalternatives.pdf Water Supply Alternatives Supplemental Evaluation] by Gannett Fleming, July 2004 | [http://www.cvilletomorrow.org/docs/water/200407-watersupplyalternatives.pdf Water Supply Alternatives Supplemental Evaluation] by Gannett Fleming, July 2004 |
Revision as of 22:34, 22 February 2009
Key studies related to the Charlottesville-Albemarle Community Water Supply
Safe Yield Study by Gannett Fleming, January 2004
This report documents a safe yield of 13.3 MGD (revised downward in July 2004 report)
Demand Analysis for the Urban Service Area by Gannett Fleming, May 2004
It estimates the demand in 2055 to be 18.7 MGD with 5% conservation measures.
Water Supply Alternatives Supplemental Evaluation by Gannett Fleming, July 2004
This report documents the downward adjustment of current safe yield from 13.3 MGD to 12.8 MGD (2002).
It projects the safe yield in 2055 to be 8.8 MGD.
It identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD).