List of water supply studies: Difference between revisions
Jump to navigation
Jump to search
1099047208 (talk | contribs) No edit summary |
1099047208 (talk | contribs) No edit summary |
||
Line 5: | Line 5: | ||
[http://www.cvilletomorrow.org/docs/water/200407-watersupplyalternatives.pdf Water Supply Alternatives Supplemental Evaluation] by Gannett Fleming, July 2004 | [http://www.cvilletomorrow.org/docs/water/200407-watersupplyalternatives.pdf Water Supply Alternatives Supplemental Evaluation] by Gannett Fleming, July 2004 | ||
This report documents the downward adjustment of safe yield | This report documents the downward adjustment of current safe yield from 13.3 MGD to 12.8 MGD (2002). | ||
It identifies the goal of finding 9.9 MGD in new water supply. | It projects the safe yield in 2055 to be 8.8 MGD. It estimates the demand in 2055 to be 18.7 MGD. | ||
It identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD). |
Revision as of 22:13, 22 February 2009
Key studies related to the Charlottesville-Albemarle Community Water Supply
Safe Yield Study by Gannett Fleming, January 2004
Water Supply Alternatives Supplemental Evaluation by Gannett Fleming, July 2004
This report documents the downward adjustment of current safe yield from 13.3 MGD to 12.8 MGD (2002).
It projects the safe yield in 2055 to be 8.8 MGD. It estimates the demand in 2055 to be 18.7 MGD.
It identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD).