List of water supply studies: Difference between revisions
Jump to navigation
Jump to search
1099047208 (talk | contribs) (Making this fit in the ref groups, but why should reader have to search for link at bottom when it could be at top inline in text??) |
(changing the name of the reference section may give you what you want -- a quick list and link to the actual studies. Also I added a new study referenced in the new one, and changed definition a bit.) |
||
Line 2: | Line 2: | ||
| __TOC__ | | __TOC__ | ||
|} | |} | ||
Studies related to the Charlottesville-Albemarle | Studies related to the Charlottesville-Albemarle water supply, including summary recommendations. Also includes required permits and applications related to water supply projects. | ||
{{clear}} | {{clear}} | ||
==RWSA-sponsored studies== | ==RWSA-sponsored studies== | ||
[[Rivanna Water & Sewer Authority]], a providers of the public water, is the primary sponsor of studies. Many of these are referenced in discussions of the [[Community Water Supply Plan]]. | |||
*'''South Fork Rivanna Reservoir Watershed Management Plan''' 1979<ref name=bowler group=study>{{cite web|url=http://www.cvilletomorrow.org/docs/water/2003-Bowler-South-Fork.pdf|title='''South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years'''|author=Stephen P. Bowler, |publisher=available through Charlottesville Tomorrow|accessdate=25 Jan 2010|publishdate=Spring 2003}}</ref>. | |||
* '''Water Demand Analysis''', [[Vanasse Hangen Brustlin]] and O'Brien & Gere Engineers, Inc., October 1997 | * '''Water Demand Analysis''', [[Vanasse Hangen Brustlin]] and O'Brien & Gere Engineers, Inc., October 1997 | ||
Line 11: | Line 15: | ||
*'''Feasibility Study for Upgrading the [[Ragged Mountain Dam]]''', [[Gannett Fleming]], February 2003 | *'''Feasibility Study for Upgrading the [[Ragged Mountain Dam]]''', [[Gannett Fleming]], February 2003 | ||
** Includes engineering investigations related to design adequacy of Lower Ragged Mountain Dam with upgrade alternatives<ref group=ref>{{cite web|url=http://www.cvilletomorrow.org/docs/water/20050406-RMDam-Options.pdf|title=RWSA Board Memorandum: Ragged Mountain Dam Upgrade Cost Comparison|author=[[Tom Frederick]] and Jennifer Whitaker|publisher=available through Charlottesville Tomorrow|accessdate=23 Jan 2010|publishdate=April 6, 2005}}</ref>. | ** Includes engineering investigations related to design adequacy of [[Lower Ragged Mountain Dam]] with upgrade alternatives<ref group=ref>{{cite web|url=http://www.cvilletomorrow.org/docs/water/20050406-RMDam-Options.pdf|title=RWSA Board Memorandum: Ragged Mountain Dam Upgrade Cost Comparison|author=[[Tom Frederick]] and Jennifer Whitaker|publisher=available through Charlottesville Tomorrow|accessdate=23 Jan 2010|publishdate=April 6, 2005}}</ref>. | ||
* | *'''South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years''', Stephen P. Bowler, Watershed Manager, Albemarle County, Spring 2003. | ||
** Written as an update to the 1979 Watershed Management Plan, describes the problems of pollution and sedimentation and includes recommendations for increased monitoring<ref group=study name=bowler/>. | |||
*'''Safe Yield Study''', Gannett Fleming, January 2004 | *'''Safe Yield Study''', Gannett Fleming, January 2004 | ||
** Documents a [[safe yield]] of 13.3 MGD (revised downward in July 2004 report)<ref group=study>{{cite web|url=http://www.cvilletomorrow.org/docs/water/200401-SafeYield.pdf|title='''Safe Yield Study'''|author= | ** Documents a [[safe yield]] of 13.3 MGD (revised downward in July 2004 report)<ref group=study>{{cite web|url=http://www.cvilletomorrow.org/docs/water/200401-SafeYield.pdf|title='''Safe Yield Study'''|author=Gannett Fleming|publisher=available through Charlottesville Tomorrow|accessdate=23 Jan 2010|publishdate=January 2004}}</ref>. | ||
* | *'''Demand Analysis for the Urban Service Area''', Gannett Fleming, May 2004 | ||
** Recommends planning for water supply demand in 2055 to be 18.7 MGD with 5% conservation measures<ref group=study>{{cite web|url=http://www.cvilletomorrow.org/docs/water/200405-GF-DemandAnalysis.pdftitle='''Demand Analysis for the Urban Service Area'''|publisher=available through Charlottesville Tomorrow|author=[[Gannett Fleming]]|publishdate=May 2004}}</ref>. | |||
* | *'''Water Supply Alternatives Supplemental Evaluation''', Gannett Fleming, July 2004 | ||
** Documents the downward adjustment of current [[safe yield]] from 13.3 MGD to 12.8 MGD (2002). | ** Documents the downward adjustment of current [[safe yield]] from 13.3 MGD to 12.8 MGD (2002). | ||
** Projects the safe yield in 2055 to be 8.8 MGD. | ** Projects the safe yield in 2055 to be 8.8 MGD. | ||
** Identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD). | ** Identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD)<ref group=study>{{cite web|url=http://www.cvilletomorrow.org/docs/water/200407-watersupplyalternatives.pdf|title='''Water Supply Alternatives Supplemental Evaluation'''|author=Gannett Fleming|publisher=available through Charlottesville Tomorrow|publishdate=July 2004}}</ref>. | ||
*Community Water Supply Project, | *'''Community Water Supply Project''', Gannett Fleming & Vanasse Hangen Brustlin, June 30, 2006 | ||
**[http://www.cvilletomorrow.org/docs/water/20060630jointpermitapplication.pdf '''Joint Permit Application'''] | **[http://www.cvilletomorrow.org/docs/water/20060630jointpermitapplication.pdf '''Joint Permit Application'''] | ||
**[http://www.cvilletomorrow.org/docs/water/20060630permitsupportdocument.pdf '''Permit Support Document'''] | **[http://www.cvilletomorrow.org/docs/water/20060630permitsupportdocument.pdf '''Permit Support Document'''] | ||
*[http://www.cvilletomorrow.org/docs/20090406-RM-Dam-ITRT-Report.pdf Ragged Mountain Dam, Independent Technical Review Team Report | *'''Ragged Mountain Dam, Independent Technical Review Team Report''', June 2, 2009 | ||
** Addresses variance in engineering plans and cost estimates for the new [[Ragged Mountain Dam]]<ref group=study>{{cite web|url=http://www.cvilletomorrow.org/docs/20090406-RM-Dam-ITRT-Report.pdf|title='''Ragged Mountain Dam, Independent Technical Review Team Report'''|author=Paul Rizzo, Donald A. Bruce, and Daniel L. Johnson|publishdate=June 2, 2009|publisher=available through Charlottesville Tomorrow|author=}}</ref> | |||
==Independent studies== | ==Independent studies== | ||
Line 37: | Line 42: | ||
==References== | ==References== | ||
=== | ===Water supply studies=== | ||
<references group=study/> | <references group=study/> | ||
Revision as of 15:39, 26 January 2010
Studies related to the Charlottesville-Albemarle water supply, including summary recommendations. Also includes required permits and applications related to water supply projects.
RWSA-sponsored studies
Rivanna Water & Sewer Authority, a providers of the public water, is the primary sponsor of studies. Many of these are referenced in discussions of the Community Water Supply Plan.
- South Fork Rivanna Reservoir Watershed Management Plan 1979[study 1].
- Water Demand Analysis, Vanasse Hangen Brustlin and O'Brien & Gere Engineers, Inc., October 1997
- Recommends planning for water supply demand in 2050 to be between 18-21 millions of gallons per day (MGD)[study 2].
- Feasibility Study for Upgrading the Ragged Mountain Dam, Gannett Fleming, February 2003
- Includes engineering investigations related to design adequacy of Lower Ragged Mountain Dam with upgrade alternatives[ref 1].
- South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years, Stephen P. Bowler, Watershed Manager, Albemarle County, Spring 2003.
- Written as an update to the 1979 Watershed Management Plan, describes the problems of pollution and sedimentation and includes recommendations for increased monitoring[study 1].
- Safe Yield Study, Gannett Fleming, January 2004
- Documents a safe yield of 13.3 MGD (revised downward in July 2004 report)[study 3].
- Demand Analysis for the Urban Service Area, Gannett Fleming, May 2004
- Recommends planning for water supply demand in 2055 to be 18.7 MGD with 5% conservation measures[study 4].
- Water Supply Alternatives Supplemental Evaluation, Gannett Fleming, July 2004
- Documents the downward adjustment of current safe yield from 13.3 MGD to 12.8 MGD (2002).
- Projects the safe yield in 2055 to be 8.8 MGD.
- Identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD)[study 5].
- Community Water Supply Project, Gannett Fleming & Vanasse Hangen Brustlin, June 30, 2006
- Ragged Mountain Dam, Independent Technical Review Team Report, June 2, 2009
- Addresses variance in engineering plans and cost estimates for the new Ragged Mountain Dam[study 6]
Independent studies
- Gahagan & Bryant dredging assessment, May 2008[citation needed].
References
Water supply studies
- ↑ 1.0 1.1 Web. South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years, Stephen P. Bowler,, available through Charlottesville Tomorrow, Spring 2003, retrieved 25 Jan 2010.
- ↑ Web. Raw Water Supply Demand Analysis, Vanasse Hangen Brustlin, available through Charlottesville Tomorrow, October 1997, retrieved 23 Jan 2010.
- ↑ Web. Safe Yield Study, Gannett Fleming, available through Charlottesville Tomorrow, January 2004, retrieved 23 Jan 2010.
- ↑ Web. Demand Analysis for the Urban Service Area , Gannett Fleming, available through Charlottesville Tomorrow, May 2004
- ↑ Web. Water Supply Alternatives Supplemental Evaluation, Gannett Fleming, available through Charlottesville Tomorrow, July 2004
- ↑ Web. Ragged Mountain Dam, Independent Technical Review Team Report, available through Charlottesville Tomorrow, June 2, 2009
Other references
- ↑ Web. RWSA Board Memorandum: Ragged Mountain Dam Upgrade Cost Comparison, Tom Frederick and Jennifer Whitaker, available through Charlottesville Tomorrow, April 6, 2005, retrieved 23 Jan 2010.