List of water supply studies: Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
(Making this fit in the ref groups, but why should reader have to search for link at bottom when it could be at top inline in text??)
(changing the name of the reference section may give you what you want -- a quick list and link to the actual studies. Also I added a new study referenced in the new one, and changed definition a bit.)
Line 2: Line 2:
| __TOC__
| __TOC__
|}
|}
Studies related to the Charlottesville-Albemarle [[Community Water Supply Plan]], including summary recommendations.
Studies related to the Charlottesville-Albemarle water supply, including summary recommendations. Also includes required permits and applications related to water supply projects.
{{clear}}
{{clear}}
==RWSA-sponsored studies==
==RWSA-sponsored studies==
The [[Rivanna Water & Sewer Authority]] sponsored numerous studies related to the 2006 [[Community Water Supply Plan]].
[[Rivanna Water & Sewer Authority]], a providers of the public water, is the primary sponsor of studies. Many of these are referenced in discussions of the [[Community Water Supply Plan]].
 
 
*'''South Fork Rivanna Reservoir Watershed Management Plan''' 1979<ref name=bowler group=study>{{cite web|url=http://www.cvilletomorrow.org/docs/water/2003-Bowler-South-Fork.pdf|title='''South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years'''|author=Stephen P. Bowler, |publisher=available through Charlottesville Tomorrow|accessdate=25 Jan 2010|publishdate=Spring 2003}}</ref>.


* '''Water Demand Analysis''', [[Vanasse Hangen Brustlin]] and O'Brien & Gere Engineers, Inc., October 1997
* '''Water Demand Analysis''', [[Vanasse Hangen Brustlin]] and O'Brien & Gere Engineers, Inc., October 1997
Line 11: Line 15:


*'''Feasibility Study for Upgrading the [[Ragged Mountain Dam]]''', [[Gannett Fleming]], February 2003
*'''Feasibility Study for Upgrading the [[Ragged Mountain Dam]]''', [[Gannett Fleming]], February 2003
** Includes engineering investigations related to design adequacy of Lower Ragged Mountain Dam with upgrade alternatives<ref group=ref>{{cite web|url=http://www.cvilletomorrow.org/docs/water/20050406-RMDam-Options.pdf|title=RWSA Board Memorandum: Ragged Mountain Dam Upgrade Cost Comparison|author=[[Tom Frederick]] and Jennifer Whitaker|publisher=available through Charlottesville Tomorrow|accessdate=23 Jan 2010|publishdate=April 6, 2005}}</ref>.
** Includes engineering investigations related to design adequacy of [[Lower Ragged Mountain Dam]] with upgrade alternatives<ref group=ref>{{cite web|url=http://www.cvilletomorrow.org/docs/water/20050406-RMDam-Options.pdf|title=RWSA Board Memorandum: Ragged Mountain Dam Upgrade Cost Comparison|author=[[Tom Frederick]] and Jennifer Whitaker|publisher=available through Charlottesville Tomorrow|accessdate=23 Jan 2010|publishdate=April 6, 2005}}</ref>.


*[http://www.cvilletomorrow.org/docs/water/2003-Bowler-South-Fork.pdf South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years], Stephen P. Bowler, Watershed Manager, Albemarle County, Spring 2003.<ref group=study>{{cite web|url=http://www.cvilletomorrow.org/docs/water/2003-Bowler-South-Fork.pdf|title='''South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years'''|author=[[Stephen P. Bowler]]|publisher=available through Charlottesville Tomorrow|accessdate=25 Jan 2010|publishdate=Spring 2003}}</ref>.
*'''South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years''', Stephen P. Bowler, Watershed Manager, Albemarle County, Spring 2003.
** Written as an update to the 1979 Watershed Management Plan, describes the problems of pollution and sedimentation and includes recommendations for increased monitoring<ref group=study name=bowler/>.


*'''Safe Yield Study''', Gannett Fleming, January 2004
*'''Safe Yield Study''', Gannett Fleming, January 2004
** Documents a [[safe yield]] of 13.3 MGD (revised downward in July 2004 report)<ref group=study>{{cite web|url=http://www.cvilletomorrow.org/docs/water/200401-SafeYield.pdf|title='''Safe Yield Study'''|author=[[Gannett Fleming]]|publisher=available through Charlottesville Tomorrow|accessdate=23 Jan 2010|publishdate=January 2004}}</ref>.
** Documents a [[safe yield]] of 13.3 MGD (revised downward in July 2004 report)<ref group=study>{{cite web|url=http://www.cvilletomorrow.org/docs/water/200401-SafeYield.pdf|title='''Safe Yield Study'''|author=Gannett Fleming|publisher=available through Charlottesville Tomorrow|accessdate=23 Jan 2010|publishdate=January 2004}}</ref>.


*[http://www.cvilletomorrow.org/docs/water/200405-GF-DemandAnalysis.pdf Demand Analysis for the Urban Service Area], [[Gannett Fleming]], May 2004
*'''Demand Analysis for the Urban Service Area''', Gannett Fleming, May 2004
** Recommends planning for water supply demand in 2055 to be 18.7 MGD with 5% conservation measures.
** Recommends planning for water supply demand in 2055 to be 18.7 MGD with 5% conservation measures<ref group=study>{{cite web|url=http://www.cvilletomorrow.org/docs/water/200405-GF-DemandAnalysis.pdftitle='''Demand Analysis for the Urban Service Area'''|publisher=available through Charlottesville Tomorrow|author=[[Gannett Fleming]]|publishdate=May 2004}}</ref>.


*[http://www.cvilletomorrow.org/docs/water/200407-watersupplyalternatives.pdf Water Supply Alternatives Supplemental Evaluation], [[Gannett Fleming]], July 2004
*'''Water Supply Alternatives Supplemental Evaluation''', Gannett Fleming, July 2004
** Documents the downward adjustment of current [[safe yield]] from 13.3 MGD to 12.8 MGD (2002).   
** Documents the downward adjustment of current [[safe yield]] from 13.3 MGD to 12.8 MGD (2002).   
** Projects the safe yield in 2055 to be 8.8 MGD.   
** Projects the safe yield in 2055 to be 8.8 MGD.   
** Identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD).
** Identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD)<ref group=study>{{cite web|url=http://www.cvilletomorrow.org/docs/water/200407-watersupplyalternatives.pdf|title='''Water Supply Alternatives Supplemental Evaluation'''|author=Gannett Fleming|publisher=available through Charlottesville Tomorrow|publishdate=July 2004}}</ref>.


*Community Water Supply Project, [[Gannett Fleming]] & [[Vanasse Hangen Brustlin]], June 30, 2006
*'''Community Water Supply Project''', Gannett Fleming & Vanasse Hangen Brustlin, June 30, 2006
**[http://www.cvilletomorrow.org/docs/water/20060630jointpermitapplication.pdf '''Joint Permit Application''']
**[http://www.cvilletomorrow.org/docs/water/20060630jointpermitapplication.pdf '''Joint Permit Application''']
**[http://www.cvilletomorrow.org/docs/water/20060630permitsupportdocument.pdf '''Permit Support Document''']  
**[http://www.cvilletomorrow.org/docs/water/20060630permitsupportdocument.pdf '''Permit Support Document''']  


*[http://www.cvilletomorrow.org/docs/20090406-RM-Dam-ITRT-Report.pdf Ragged Mountain Dam, Independent Technical Review Team Report], June 2, 2009
*'''Ragged Mountain Dam, Independent Technical Review Team Report''', June 2, 2009
** Addresses variance in engineering plans and cost estimates for the new [[Ragged Mountain Dam]].
** Addresses variance in engineering plans and cost estimates for the new [[Ragged Mountain Dam]]<ref group=study>{{cite web|url=http://www.cvilletomorrow.org/docs/20090406-RM-Dam-ITRT-Report.pdf|title='''Ragged Mountain Dam, Independent Technical Review Team Report'''|author=Paul Rizzo, Donald A. Bruce, and Daniel L. Johnson|publishdate=June 2, 2009|publisher=available through Charlottesville Tomorrow|author=}}</ref>


==Independent studies==
==Independent studies==
Line 37: Line 42:


==References==
==References==
===References from the studies===
===Water supply studies===
<references group=study/>
<references group=study/>



Revision as of 15:39, 26 January 2010

Studies related to the Charlottesville-Albemarle water supply, including summary recommendations. Also includes required permits and applications related to water supply projects.

RWSA-sponsored studies

Rivanna Water & Sewer Authority, a providers of the public water, is the primary sponsor of studies. Many of these are referenced in discussions of the Community Water Supply Plan.


  • South Fork Rivanna Reservoir Watershed Management Plan 1979[study 1].
  • Water Demand Analysis, Vanasse Hangen Brustlin and O'Brien & Gere Engineers, Inc., October 1997
    • Recommends planning for water supply demand in 2050 to be between 18-21 millions of gallons per day (MGD)[study 2].
  • South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years, Stephen P. Bowler, Watershed Manager, Albemarle County, Spring 2003.
    • Written as an update to the 1979 Watershed Management Plan, describes the problems of pollution and sedimentation and includes recommendations for increased monitoring[study 1].
  • Safe Yield Study, Gannett Fleming, January 2004
  • Demand Analysis for the Urban Service Area, Gannett Fleming, May 2004
    • Recommends planning for water supply demand in 2055 to be 18.7 MGD with 5% conservation measures[study 4].
  • Water Supply Alternatives Supplemental Evaluation, Gannett Fleming, July 2004
    • Documents the downward adjustment of current safe yield from 13.3 MGD to 12.8 MGD (2002).
    • Projects the safe yield in 2055 to be 8.8 MGD.
    • Identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD)[study 5].
  • Ragged Mountain Dam, Independent Technical Review Team Report, June 2, 2009

Independent studies

References

Water supply studies

  1. 1.0 1.1 Web. South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years, Stephen P. Bowler,, available through Charlottesville Tomorrow, Spring 2003, retrieved 25 Jan 2010.
  2. Web. Raw Water Supply Demand Analysis, Vanasse Hangen Brustlin, available through Charlottesville Tomorrow, October 1997, retrieved 23 Jan 2010.
  3. Web. Safe Yield Study, Gannett Fleming, available through Charlottesville Tomorrow, January 2004, retrieved 23 Jan 2010.
  4. Web. Demand Analysis for the Urban Service Area , Gannett Fleming, available through Charlottesville Tomorrow, May 2004
  5. Web. Water Supply Alternatives Supplemental Evaluation, Gannett Fleming, available through Charlottesville Tomorrow, July 2004
  6. Web. Ragged Mountain Dam, Independent Technical Review Team Report, available through Charlottesville Tomorrow, June 2, 2009

Other references

  1. Web. RWSA Board Memorandum: Ragged Mountain Dam Upgrade Cost Comparison, Tom Frederick and Jennifer Whitaker, available through Charlottesville Tomorrow, April 6, 2005, retrieved 23 Jan 2010.