List of water supply studies: Difference between revisions
Jump to navigation
Jump to search
1099047208 (talk | contribs) (not sure I follow the new reference structure, but I added a new report - I want hyperlinks to PDFs be active in list of reports) |
1099047208 (talk | contribs) (Making this fit in the ref groups, but why should reader have to search for link at bottom when it could be at top inline in text??) |
||
Line 13: | Line 13: | ||
** Includes engineering investigations related to design adequacy of Lower Ragged Mountain Dam with upgrade alternatives<ref group=ref>{{cite web|url=http://www.cvilletomorrow.org/docs/water/20050406-RMDam-Options.pdf|title=RWSA Board Memorandum: Ragged Mountain Dam Upgrade Cost Comparison|author=[[Tom Frederick]] and Jennifer Whitaker|publisher=available through Charlottesville Tomorrow|accessdate=23 Jan 2010|publishdate=April 6, 2005}}</ref>. | ** Includes engineering investigations related to design adequacy of Lower Ragged Mountain Dam with upgrade alternatives<ref group=ref>{{cite web|url=http://www.cvilletomorrow.org/docs/water/20050406-RMDam-Options.pdf|title=RWSA Board Memorandum: Ragged Mountain Dam Upgrade Cost Comparison|author=[[Tom Frederick]] and Jennifer Whitaker|publisher=available through Charlottesville Tomorrow|accessdate=23 Jan 2010|publishdate=April 6, 2005}}</ref>. | ||
*[http://www.cvilletomorrow.org/docs/water/2003-Bowler-South-Fork.pdf South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years], Stephen P. Bowler, Watershed Manager, Albemarle County, Spring 2003.<ref>{{cite web|url=http://www.cvilletomorrow.org/docs/water/2003-Bowler-South-Fork.pdf|title=South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years|author=[[Stephen P. Bowler]]|publisher=available through Charlottesville Tomorrow|accessdate=25 Jan 2010|publishdate=Spring 2003}}</ref>. | *[http://www.cvilletomorrow.org/docs/water/2003-Bowler-South-Fork.pdf South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years], Stephen P. Bowler, Watershed Manager, Albemarle County, Spring 2003.<ref group=study>{{cite web|url=http://www.cvilletomorrow.org/docs/water/2003-Bowler-South-Fork.pdf|title='''South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years'''|author=[[Stephen P. Bowler]]|publisher=available through Charlottesville Tomorrow|accessdate=25 Jan 2010|publishdate=Spring 2003}}</ref>. | ||
*'''Safe Yield Study''', Gannett Fleming, January 2004 | *'''Safe Yield Study''', Gannett Fleming, January 2004 |
Revision as of 23:44, 25 January 2010
Studies related to the Charlottesville-Albemarle Community Water Supply Plan, including summary recommendations.
RWSA-sponsored studies
The Rivanna Water & Sewer Authority sponsored numerous studies related to the 2006 Community Water Supply Plan.
- Water Demand Analysis, Vanasse Hangen Brustlin and O'Brien & Gere Engineers, Inc., October 1997
- Recommends planning for water supply demand in 2050 to be between 18-21 millions of gallons per day (MGD)[study 1].
- Feasibility Study for Upgrading the Ragged Mountain Dam, Gannett Fleming, February 2003
- Includes engineering investigations related to design adequacy of Lower Ragged Mountain Dam with upgrade alternatives[ref 1].
- South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years, Stephen P. Bowler, Watershed Manager, Albemarle County, Spring 2003.[study 2].
- Safe Yield Study, Gannett Fleming, January 2004
- Documents a safe yield of 13.3 MGD (revised downward in July 2004 report)[study 3].
- Demand Analysis for the Urban Service Area, Gannett Fleming, May 2004
- Recommends planning for water supply demand in 2055 to be 18.7 MGD with 5% conservation measures.
- Water Supply Alternatives Supplemental Evaluation, Gannett Fleming, July 2004
- Documents the downward adjustment of current safe yield from 13.3 MGD to 12.8 MGD (2002).
- Projects the safe yield in 2055 to be 8.8 MGD.
- Identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD).
- Community Water Supply Project, Gannett Fleming & Vanasse Hangen Brustlin, June 30, 2006
- Ragged Mountain Dam, Independent Technical Review Team Report, June 2, 2009
- Addresses variance in engineering plans and cost estimates for the new Ragged Mountain Dam.
Independent studies
- Gahagan & Bryant dredging assessment, May 2008[citation needed].
References
References from the studies
- ↑ Web. Raw Water Supply Demand Analysis, Vanasse Hangen Brustlin, available through Charlottesville Tomorrow, October 1997, retrieved 23 Jan 2010.
- ↑ Web. South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years, Stephen P. Bowler, available through Charlottesville Tomorrow, Spring 2003, retrieved 25 Jan 2010.
- ↑ Web. Safe Yield Study, Gannett Fleming, available through Charlottesville Tomorrow, January 2004, retrieved 23 Jan 2010.
Other references
- ↑ Web. RWSA Board Memorandum: Ragged Mountain Dam Upgrade Cost Comparison, Tom Frederick and Jennifer Whitaker, available through Charlottesville Tomorrow, April 6, 2005, retrieved 23 Jan 2010.