List of water supply studies: Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
(not done yet, trying to come to terms with Wikipedia:WP:NOTLINK#LINK, maybe there is a cvillepedia style exception? fixing some stuff after checking the refs.)
(not sure I follow the new reference structure, but I added a new report - I want hyperlinks to PDFs be active in list of reports)
Line 11: Line 11:


*'''Feasibility Study for Upgrading the [[Ragged Mountain Dam]]''', [[Gannett Fleming]], February 2003
*'''Feasibility Study for Upgrading the [[Ragged Mountain Dam]]''', [[Gannett Fleming]], February 2003
** Includes engineering investigations related to design adequacy of Lower Ragged Mountain Dam with upgrade alternatives<ref group=ref>{{cite web|url=http://www.cvilletomorrow.org/docs/water/20050406-RMDam-Options.pdf|title=RWSA Board Memrandum: Ragged Mountain Dam Upgrade Cost Comparison|author=[[Tom Frederick]] and Jennifer Whitaker|publisher=available through Charlottesville Tomorrow|accessdate=23 Jan 2010|publishdate=April 6, 2005}}</ref>.
** Includes engineering investigations related to design adequacy of Lower Ragged Mountain Dam with upgrade alternatives<ref group=ref>{{cite web|url=http://www.cvilletomorrow.org/docs/water/20050406-RMDam-Options.pdf|title=RWSA Board Memorandum: Ragged Mountain Dam Upgrade Cost Comparison|author=[[Tom Frederick]] and Jennifer Whitaker|publisher=available through Charlottesville Tomorrow|accessdate=23 Jan 2010|publishdate=April 6, 2005}}</ref>.
 
*[http://www.cvilletomorrow.org/docs/water/2003-Bowler-South-Fork.pdf South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years], Stephen P. Bowler, Watershed Manager, Albemarle County, Spring 2003.<ref>{{cite web|url=http://www.cvilletomorrow.org/docs/water/2003-Bowler-South-Fork.pdf|title=South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years|author=[[Stephen P. Bowler]]|publisher=available through Charlottesville Tomorrow|accessdate=25 Jan 2010|publishdate=Spring 2003}}</ref>.


*'''Safe Yield Study''', Gannett Fleming, January 2004
*'''Safe Yield Study''', Gannett Fleming, January 2004

Revision as of 23:41, 25 January 2010

Studies related to the Charlottesville-Albemarle Community Water Supply Plan, including summary recommendations.

RWSA-sponsored studies

The Rivanna Water & Sewer Authority sponsored numerous studies related to the 2006 Community Water Supply Plan.

  • Water Demand Analysis, Vanasse Hangen Brustlin and O'Brien & Gere Engineers, Inc., October 1997
    • Recommends planning for water supply demand in 2050 to be between 18-21 millions of gallons per day (MGD)[study 1].
  • Feasibility Study for Upgrading the Ragged Mountain Dam, Gannett Fleming, February 2003
    • Includes engineering investigations related to design adequacy of Lower Ragged Mountain Dam with upgrade alternatives[ref 1].
  • Safe Yield Study, Gannett Fleming, January 2004

Independent studies

References

References from the studies

  1. Web. Raw Water Supply Demand Analysis, Vanasse Hangen Brustlin, available through Charlottesville Tomorrow, October 1997, retrieved 23 Jan 2010.
  2. Web. Safe Yield Study, Gannett Fleming, available through Charlottesville Tomorrow, January 2004, retrieved 23 Jan 2010.

Other references

  1. Web. RWSA Board Memorandum: Ragged Mountain Dam Upgrade Cost Comparison, Tom Frederick and Jennifer Whitaker, available through Charlottesville Tomorrow, April 6, 2005, retrieved 23 Jan 2010.
  1. Web. South Fork Rivanna Reservoir and Watershed: Reflecting on 36 years, Anticipating 50 years, Stephen P. Bowler, available through Charlottesville Tomorrow, Spring 2003, retrieved 25 Jan 2010.