List of water supply studies: Difference between revisions
Jump to navigation
Jump to search
m (moved Water Supply Studies to List of water supply studies: it's a list, and needed proper cap'zn) |
1099047208 (talk | contribs) m (→RWSA-sponsored Studies: formatting) |
||
Line 2: | Line 2: | ||
==RWSA-sponsored Studies== | ==RWSA-sponsored Studies== | ||
The [[Rivanna Water & Sewer Authority]] sponsored | The [[Rivanna Water & Sewer Authority]] sponsored numerous studies related to the 2006 [[Community Water Supply Plan]]. | ||
[http://www.cvilletomorrow.org/docs/water/199710-VHB-DemandAnalysis.pdf Raw Water Supply Demand Analysis], Vanasse Hangen Brustlin, October 1997 | *[http://www.cvilletomorrow.org/docs/water/199710-VHB-DemandAnalysis.pdf Raw Water Supply Demand Analysis], [[Vanasse Hangen Brustlin]], October 1997 | ||
* Recommends planning for water supply demand in 2050 to be between 18-21 millions of gallons per day (MGD). | ** Recommends planning for water supply demand in 2050 to be between 18-21 millions of gallons per day (MGD). | ||
[http://www.cvilletomorrow.org/docs/water/200401-SafeYield.pdf Safe Yield Study], Gannett Fleming, January 2004 | *[http://www.cvilletomorrow.org/docs/water/200401-SafeYield.pdf Safe Yield Study], [[Gannett Fleming]], January 2004 | ||
* Documents a [[safe yield]] of 13.3 MGD (revised downward in July 2004 report) | ** Documents a [[safe yield]] of 13.3 MGD (revised downward in July 2004 report) | ||
[http://www.cvilletomorrow.org/docs/water/200405-GF-DemandAnalysis.pdf Demand Analysis for the Urban Service Area], Gannett Fleming, May 2004 | *[http://www.cvilletomorrow.org/docs/water/200405-GF-DemandAnalysis.pdf Demand Analysis for the Urban Service Area], [[Gannett Fleming]], May 2004 | ||
* Recommends planning for water supply demand in 2055 to be 18.7 MGD with 5% conservation measures. | ** Recommends planning for water supply demand in 2055 to be 18.7 MGD with 5% conservation measures. | ||
[http://www.cvilletomorrow.org/docs/water/200407-watersupplyalternatives.pdf Water Supply Alternatives Supplemental Evaluation], Gannett Fleming, July 2004 | *[http://www.cvilletomorrow.org/docs/water/200407-watersupplyalternatives.pdf Water Supply Alternatives Supplemental Evaluation], [[Gannett Fleming]], July 2004 | ||
* Documents the downward adjustment of current [[safe yield]] from 13.3 MGD to 12.8 MGD (2002). | ** Documents the downward adjustment of current [[safe yield]] from 13.3 MGD to 12.8 MGD (2002). | ||
* Projects the safe yield in 2055 to be 8.8 MGD. | ** Projects the safe yield in 2055 to be 8.8 MGD. | ||
* Identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD). | ** Identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD). | ||
Community Water Supply Project [http://www.cvilletomorrow.org/docs/water/20060630jointpermitapplication.pdf '''Joint Permit Application'''] | *Community Water Supply Project, [[Gannett Fleming]] & [[Vanasse Hangen Brustlin]], June 30, 2006 | ||
**[http://www.cvilletomorrow.org/docs/water/20060630jointpermitapplication.pdf '''Joint Permit Application'''] | |||
**[http://www.cvilletomorrow.org/docs/water/20060630permitsupportdocument.pdf '''Permit Support Document'''] | |||
[http://www.cvilletomorrow.org/docs/20090406-RM-Dam-ITRT-Report.pdf Ragged Mountain Dam, Independent Technical Review Team Report], June 2, 2009 | *[http://www.cvilletomorrow.org/docs/20090406-RM-Dam-ITRT-Report.pdf Ragged Mountain Dam, Independent Technical Review Team Report], June 2, 2009 | ||
* Addresses variance in engineering plans and cost estimates for the new [[Ragged Mountain Dam]]. | ** Addresses variance in engineering plans and cost estimates for the new [[Ragged Mountain Dam]]. | ||
==Independent Studies== | ==Independent Studies== |
Revision as of 09:01, 23 January 2010
Studies related to the Charlottesville-Albemarle Community Water Supply Plan.
RWSA-sponsored Studies
The Rivanna Water & Sewer Authority sponsored numerous studies related to the 2006 Community Water Supply Plan.
- Raw Water Supply Demand Analysis, Vanasse Hangen Brustlin, October 1997
- Recommends planning for water supply demand in 2050 to be between 18-21 millions of gallons per day (MGD).
- Safe Yield Study, Gannett Fleming, January 2004
- Documents a safe yield of 13.3 MGD (revised downward in July 2004 report)
- Demand Analysis for the Urban Service Area, Gannett Fleming, May 2004
- Recommends planning for water supply demand in 2055 to be 18.7 MGD with 5% conservation measures.
- Water Supply Alternatives Supplemental Evaluation, Gannett Fleming, July 2004
- Documents the downward adjustment of current safe yield from 13.3 MGD to 12.8 MGD (2002).
- Projects the safe yield in 2055 to be 8.8 MGD.
- Identifies the goal of finding 9.9 MGD in new water supply (18.7 MGD - 8.8 MGD = 9.9 MGD).
- Community Water Supply Project, Gannett Fleming & Vanasse Hangen Brustlin, June 30, 2006
- Ragged Mountain Dam, Independent Technical Review Team Report, June 2, 2009
- Addresses variance in engineering plans and cost estimates for the new Ragged Mountain Dam.
Independent Studies
- Gahagan & Bryant dredging assessment, May 2008