Lickinghole Creek Bridge: Difference between revisions
Jump to navigation
Jump to search
Jcglendening (talk | contribs) No edit summary |
Jcglendening (talk | contribs) No edit summary |
||
Line 17: | Line 17: | ||
| contact =[[Juandiego Wade]], Transportation Planner, Albemarle County | | contact =[[Juandiego Wade]], Transportation Planner, Albemarle County | ||
}} | }} | ||
==Map== | |||
{{Map|lat=38.061236|lng=-78.683996|zoom=14}} | |||
== Project details == | == Project details == | ||
Line 26: | Line 29: | ||
The creation of the bridge will be addressed as neighboring parcels are developed and rezoning requests come before County. As such, there is no current proposal to build the bridge. | The creation of the bridge will be addressed as neighboring parcels are developed and rezoning requests come before County. As such, there is no current proposal to build the bridge. | ||
== Next public meeting == | == Next public meeting == | ||
The Eastern Avenue project, which included the Lickinghole Creek Bridge, will proceed as Albemarle County considers the rezoning of property in and around the area. | The Eastern Avenue project, which included the Lickinghole Creek Bridge, will proceed as Albemarle County considers the rezoning of property in and around the area. | ||
== External links == | == External links == | ||
== References == | == References == | ||
<references/> | |||
[[Category: Transportation Matrix]] | [[Category: Transportation Matrix]] | ||
Revision as of 11:27, 7 July 2009
Lickinghole Creek Bridge | ||
---|---|---|
Planned
|
||
Project Overview
|
| |
Interconnect future and existing Crozet neighborhoods. Eastern Avenue will traverse the Lickinghole Creek Bridge.
|
||
Cost | $4,000,000 | |
Sponsor | Albemarle | |
Next meeting | While no specific meeting, Lickinghole Creek Bridge could be discussed as the Crozet Master Plan is revisited in 2009. | |
Status Update
|
| |
Part of Crozet Master Plan. Will be addressed as neighboring parcels are developed and rezoning requests come before County. Schedule |
||
Website | none | |
Contact | Juandiego Wade, Transportation Planner, Albemarle County |
Map
Project details
The proposed Lickinghole Creek Bridge is a structure that will carry the proposed Eastern Avenue over the creek. The current cost estimate is $4 million. It is part of the Crozet Master Plan.
The contact for the project is Juan Wade, Transportation Planner, Albemarle County.
Status
The creation of the bridge will be addressed as neighboring parcels are developed and rezoning requests come before County. As such, there is no current proposal to build the bridge.
Next public meeting
The Eastern Avenue project, which included the Lickinghole Creek Bridge, will proceed as Albemarle County considers the rezoning of property in and around the area.