Jefferson Park Avenue Bridge Replacement: Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
(infobox, stub, links, misc)
(redirect)
 
(4 intermediate revisions by one other user not shown)
Line 1: Line 1:
{{transport-stub}}{{infobox Transportation|name=Jefferson Park Avenue Bridge Replacement|status={{planned}}}}
#REDIRECT [[Jefferson Park Avenue Extended Bridge Replacement]]
 
This project is to replace a stone bridge over the Norfolk Southern Rail on [[Jefferson Park Avenue]]
Extended. [[Greg Krystyniak]] with VDOT is the project director.
 
Right of Way acquisition has been authorized. The process to have an acquisition date of spring 2009 is ongoing. The item is expected to be advertised for construction in November 2009, with construction the following spring.
 
==References==
* Feb 2008 [[MPO]] tracking
 
[[Category: Transportation Matrix]]

Latest revision as of 19:41, 17 October 2012