Jefferson Park Avenue Bridge Replacement: Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
No edit summary
(infobox, stub, links, misc)
Line 1: Line 1:
Raw info from Feb 2008 MPO tracking
{{transport-stub}}{{infobox Transportation|name=Jefferson Park Avenue Bridge Replacement|status={{planned}}}}


This project is to replace a stone bridge over the Norfolk Southern Rail on Jefferson Park Avenue  
This project is to replace a stone bridge over the Norfolk Southern Rail on [[Jefferson Park Avenue]]
Extended. Greg Krystyniak with VDOT is the project director.  
Extended. [[Greg Krystyniak]] with VDOT is the project director.  


Right of Way Acquisition has been Authorized. The process to have an acquisition date of spring 2009 is ongoing. The item is expected to be advertised for construction in November 2009, with construction the following spring.
Right of Way acquisition has been authorized. The process to have an acquisition date of spring 2009 is ongoing. The item is expected to be advertised for construction in November 2009, with construction the following spring.
 
==References==
* Feb 2008 [[MPO]] tracking


[[Category: Transportation Matrix]]
[[Category: Transportation Matrix]]

Revision as of 20:28, 9 November 2009


Streetcar-photo-sim.jpg This Transportation-related article is a stub. You can help cvillepedia by expanding it.





Jefferson Park Avenue Bridge Replacement

Planned

Project Overview

Status Update

This project is to replace a stone bridge over the Norfolk Southern Rail on Jefferson Park Avenue Extended. Greg Krystyniak with VDOT is the project director.

Right of Way acquisition has been authorized. The process to have an acquisition date of spring 2009 is ongoing. The item is expected to be advertised for construction in November 2009, with construction the following spring.

References

  • Feb 2008 MPO tracking