Grade separated interchange at Rio Road and US29: Difference between revisions
Jump to navigation
Jump to search
m (fixed something) |
(update (more coming)) |
||
Line 3: | Line 3: | ||
| photo = | | photo = | ||
| caption = | | caption = | ||
| status ={{ | | status ={{planned}} | ||
<!--ABOVE USE:{{proposed}},{{planned}},{{underway}},{{complete}},or {{canceled}} --> | <!--ABOVE USE:{{proposed}},{{planned}},{{underway}},{{complete}},or {{canceled}} --> | ||
| meeting = | | meeting = July 2 Board of Supervisors discussion of business assistance program | ||
| location = [[Albemarle County]] | | location = [[Albemarle County]] | ||
<!--ABOVE USE JURISDICTION: Albemarle, Charlottesville --> | <!--ABOVE USE JURISDICTION: Albemarle, Charlottesville --> | ||
Line 12: | Line 12: | ||
<!--ABOVE USE: Albemarle, Charlottesville, VDOT --> | <!--ABOVE USE: Albemarle, Charlottesville, VDOT --> | ||
| purpose = Major reconstruction of intersection | | purpose = Major reconstruction of intersection | ||
| status-desc = | | status-desc = Fully funded by the CTB on June 18, 2014 | ||
| website = | | website = | ||
| vdot-dashboard = | | vdot-dashboard = | ||
Line 18: | Line 18: | ||
}}{{transport-stub}} | }}{{transport-stub}} | ||
On June 18, 2014, the [[Commonwealth Transportation Board]] approved $81 million for design and construction of a grade-separated interchange at [[Rio Road]] and U.S. 29. <ref name="done">{{cite web|title=Western Bypass funding eliminated; CTB supports other U.S. 29 projects|url=http://www.cvilletomorrow.org/news/article/18369-bypass-funding-eliminated/|author=Sean Tubbs|work=|publisher=Charlottesville Tomorrow|location=|publishdate=June 18, 2014|accessdate=June 19, 2014}}</ref> The project is called for in the [[Places29 Master Plan]]] | |||
The project | The project has been part of the discussions of how to address traffic congestion on U.S. 29 for many decades. | ||
The project was recommended by the [[Route 29 Advisory Panel]]. <ref>{{cite web|title=Recommendations unveiled for U.S. 29 congestion relief|url=http://www.cvilletomorrow.org/news/article/18056-29-panel-recommendation/|author=Sean Tubbs|work=|publisher=Charlottesville Tomorrow|location=|publishdate=May 8, 2014|accessdate=May 19, 2014}}</ref> It has a preliminary cost estimate of $81 million. | |||
{{stub}} | {{stub}} | ||
==History== | |||
==Opposition from the business community== | |||
==Construction phasing== | |||
==References== | ==References== | ||
{{reflist}} | {{reflist}} |
Revision as of 10:59, 19 June 2014
Grade-separated interchange at Rio Road and U.S. 29 | ||
---|---|---|
Planned
|
||
Project Overview
|
| |
Major reconstruction of intersection
|
||
Cost | $81 million | |
Location | Albemarle County | |
Sponsor | Albemarle County | |
Next meeting | July 2 Board of Supervisors discussion of business assistance program | |
Status Update
|
| |
Fully funded by the CTB on June 18, 2014 |
This Transportation-related article is a stub. You can help cvillepedia by expanding it. |
On June 18, 2014, the Commonwealth Transportation Board approved $81 million for design and construction of a grade-separated interchange at Rio Road and U.S. 29. [1] The project is called for in the Places29 Master Plan]
The project has been part of the discussions of how to address traffic congestion on U.S. 29 for many decades.
The project was recommended by the Route 29 Advisory Panel. [2] It has a preliminary cost estimate of $81 million.
This article is a stub. You can help cvillepedia by expanding it. |
History
Opposition from the business community
Construction phasing
References
- ↑ Web. Western Bypass funding eliminated; CTB supports other U.S. 29 projects, Sean Tubbs, Charlottesville Tomorrow, June 18, 2014, retrieved June 19, 2014.
- ↑ Web. Recommendations unveiled for U.S. 29 congestion relief, Sean Tubbs, Charlottesville Tomorrow, May 8, 2014, retrieved May 19, 2014.