Georgetown Road: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
(update) |
||
Line 1: | Line 1: | ||
{{transport-stub}} | {{transport-stub}} | ||
{{Infobox Transportation | {{Infobox Transportation | ||
| name =Georgetown Road | | name =Georgetown Road | ||
| photo = | | photo = | ||
| caption = | | caption = | ||
| status ={{ | | status ={{underway}} | ||
<!--ABOVE USE:{{proposed}},{{planned}},{{underway}},{{complete}},or {{canceled}} --> | <!--ABOVE USE:{{proposed}},{{planned}},{{underway}},{{complete}},or {{canceled}} --> | ||
| meeting = N/A | | meeting = N/A | ||
Line 23: | Line 18: | ||
| contact =Tracy Elliott, [[VDOT]] project manager | | contact =Tracy Elliott, [[VDOT]] project manager | ||
}} | }} | ||
'''Georgetown Road''' connects [[Barracks Road]] with [[Hydraulic Road]], north of [[U.S. 29]]. | |||
==Improvements== | |||
A plan to make road improvements and add multi-modal facilities is currently under construction. | |||
An asphalt pedestrian pathway on the west side of the Road is being replaced with a five-foot wide concrete sidewalk with a curb and gutter. Additionally, four pedestrian crossings are being added. <ref name="VDOT">{{cite web|title=|url=http://www.virginiadot.org/projects/culpeper/georgetown_road.asp|author=|work=|publisher=Virginia Department of Transportation|location=|publishdate=|accessdate=August 24, 2011}}</ref> | |||
The road has been closed to through traffic during construction but is partially reopened. VDOT has planned a completion date of September 23, 2011. <ref name="VDOT" /> | |||
==Timeline== | |||
February 8, 2011: Project bid for construction. <ref name="kelsey-email">{{cite email|subject=ad date for Jarmans Gap?|from=Jack M. Kelsey, PE|sourceorg=Albemarle County|to=Sean Tubbs|repositoryorg=Charlottesville Tomorrow|senddate=January 27, 2011}}</ref> | |||
==Map== | ==Map== |
Revision as of 12:46, 24 August 2011
This Transportation-related article is a stub. You can help cvillepedia by expanding it. |
Georgetown Road | ||
---|---|---|
Project Underway
|
||
Project Overview
|
| |
Improve pedestrian and vehicular safety by making road improvements and adding multi-modal facilities (bike lanes and improved sidewalks).
|
||
Cost | $3,018,300 | |
Sponsor | VDOT | |
Next meeting | N/A | |
Status Update
|
| |
Ad date of Feb. 8, 2011. [1] Priority on County’s Secondary Six-Year Improvement Program. |
||
Website | Project website | |
Contact | Tracy Elliott, VDOT project manager |
Georgetown Road connects Barracks Road with Hydraulic Road, north of U.S. 29.
Improvements
A plan to make road improvements and add multi-modal facilities is currently under construction.
An asphalt pedestrian pathway on the west side of the Road is being replaced with a five-foot wide concrete sidewalk with a curb and gutter. Additionally, four pedestrian crossings are being added. [2]
The road has been closed to through traffic during construction but is partially reopened. VDOT has planned a completion date of September 23, 2011. [2]
Timeline
February 8, 2011: Project bid for construction. [1]