Gannett Fleming

From Cvillepedia
Revision as of 09:51, 28 March 2012 by JMarley (talk | contribs) (Removed stub category.)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Gannett Fleming was retained in 2003 by the Rivanna Water and Sewer Authority to develop a water supply plan[citation needed] and in 2006 to design the new Ragged Mountain Dam.

Ragged Mountain Dam

Gannett Fleming worked during 2007-2008 on the preliminary dam design and geotechnical research before the project was temporarily halted in August 2008. In September 2009 the Rivanna Water and Sewer Authority replaced Gannett Fleming, retaining Schnabel Engineering Associates to prepare a preliminary design for the new dam.[1]

References

  1. Web. Engineering firm with local ties hired to design new Ragged Mountain Dam, Wheeler, Brian A., Charlottesville Tomorrow News Center, Charlottesville Tomorrow, 23 Sept. 2009, retrieved 23 Sept. 2009.

External Links