Fontaine Avenue Streetscape: Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
No edit summary
(+date for design public hearing)
Line 5: Line 5:
| status ={{planned}}
| status ={{planned}}
<!--ABOVE USE:{{proposed}},{{planned}},{{underway}},{{complete}},or {{canceled}} -->
<!--ABOVE USE:{{proposed}},{{planned}},{{underway}},{{complete}},or {{canceled}} -->
| meeting = April 18, 2019 at Fontaine Avenue CFD Station
| meeting = [[May 12]], [[2021]] Design Public Hearing
| location = Charlottesville
| location = Charlottesville
| cost = $11.7 million  
| cost = $11.7 million  
Line 42: Line 42:
"Fontaine Avenue is a mixed use residential/commercial gateway to Charlottesville and the University of Virginia used by people who walk, bike, drive and use transit. Existing right-of-way is 50’ with two travel lanes, on-street parking, 4’ sidewalk on the south side of the street, and non-continuous bike lanes. AADT is 11000. A new fire station at Fontaine and Summit along with acting as the primary connection between 64/29 to the UVA Hospital increases the need to improve response time and traffic flow. Fontaine Research Park, just west of the study area, plans to expand to 875,000 square feet of development, and are currently at 565,000 square feet of building development. This streetscape project will improve pedestrian and bicycle facilities, safety for all users, and traffic flow on Fontaine Avenue from Maury/Jefferson Park Avenue to the City line (about .43 miles). The proposed improvements include a context sensitive approach with a three-lane roadway with 10 - 12’ wide median with some trees where median width allows and (2) dedicated left turn lanes; 5’ sidewalk; 6' landscape and street tree buffer; 6"curb and 5' bike lanes on both sides of the street; and ADA Improvements; rapid-flash beacons at (1) intersection; and pedestrian-scale lighting at 60’ oc. Reimagined access management with the project would create left turn lanes and possibly combine/reduce the numerous driveway entrances/exits off of the corridor."
"Fontaine Avenue is a mixed use residential/commercial gateway to Charlottesville and the University of Virginia used by people who walk, bike, drive and use transit. Existing right-of-way is 50’ with two travel lanes, on-street parking, 4’ sidewalk on the south side of the street, and non-continuous bike lanes. AADT is 11000. A new fire station at Fontaine and Summit along with acting as the primary connection between 64/29 to the UVA Hospital increases the need to improve response time and traffic flow. Fontaine Research Park, just west of the study area, plans to expand to 875,000 square feet of development, and are currently at 565,000 square feet of building development. This streetscape project will improve pedestrian and bicycle facilities, safety for all users, and traffic flow on Fontaine Avenue from Maury/Jefferson Park Avenue to the City line (about .43 miles). The proposed improvements include a context sensitive approach with a three-lane roadway with 10 - 12’ wide median with some trees where median width allows and (2) dedicated left turn lanes; 5’ sidewalk; 6' landscape and street tree buffer; 6"curb and 5' bike lanes on both sides of the street; and ADA Improvements; rapid-flash beacons at (1) intersection; and pedestrian-scale lighting at 60’ oc. Reimagined access management with the project would create left turn lanes and possibly combine/reduce the numerous driveway entrances/exits off of the corridor."


{{clear}}


{{clear}}
==Map==
==Map==
{{Coord|38.025928|N|78.516453|W|display=title}}
{{Coord|38.025928|N|78.516453|W|display=title}}

Revision as of 10:30, 29 April 2021


Fontaine Avenue Streetscape
Scorecard 682.jpg

Planned

Project Overview

The project will reconstruct 0.43 miles of Fontaine Ave. from Maury/Jefferson Park Avenue to the City line in Charlottesville and includes entrance consolation, bike lanes, sidewalk, turn lanes, landscaping and some raised median.
Cost $11.7 million
Location Charlottesville
Sponsor Charlottesville
Next meeting May 12, 2021 Design Public Hearing

Status Update

Working through HB2 process for FY2017

Website https://fontainestreetscape.com/
Contact Alexander Ikefuna, NDS Director

The Fontaine Avenue Streetscape is project funded through VDOT's Smart Scale process to make multimodal improvements on a 0.43 mile section of Fontaine Avenue. The project scored a 1.3 in what had been known as the HB2 process in the winter of 2016. It was ranked 10 out of 17 projects submitted in VDOT's Culpeper District. [1]

The project appears to be a successor to an earlier one.

RK&K was awarded a contract to design and build the project. [citation needed]

A letter has been sent to VDOT requesting the extension of the project to Ray C. Hunt Drive in Albemarle County. [2] It appears VDOT did not expand the scope.

In the summer of 2020, the project is expected to be at the 60 percent design phase.


Streetcar-photo-sim.jpg This Transportation-related article is a stub. You can help cvillepedia by expanding it.


History

City Council agreed to apply for the project in September 2015. [3]

The Commonwealth Transportation Board approved the project in June 2016. [4]

City Council authorized funding for the project in January 2017 after a public hearing. [5]

Project description from application

"Fontaine Avenue is a mixed use residential/commercial gateway to Charlottesville and the University of Virginia used by people who walk, bike, drive and use transit. Existing right-of-way is 50’ with two travel lanes, on-street parking, 4’ sidewalk on the south side of the street, and non-continuous bike lanes. AADT is 11000. A new fire station at Fontaine and Summit along with acting as the primary connection between 64/29 to the UVA Hospital increases the need to improve response time and traffic flow. Fontaine Research Park, just west of the study area, plans to expand to 875,000 square feet of development, and are currently at 565,000 square feet of building development. This streetscape project will improve pedestrian and bicycle facilities, safety for all users, and traffic flow on Fontaine Avenue from Maury/Jefferson Park Avenue to the City line (about .43 miles). The proposed improvements include a context sensitive approach with a three-lane roadway with 10 - 12’ wide median with some trees where median width allows and (2) dedicated left turn lanes; 5’ sidewalk; 6' landscape and street tree buffer; 6"curb and 5' bike lanes on both sides of the street; and ADA Improvements; rapid-flash beacons at (1) intersection; and pedestrian-scale lighting at 60’ oc. Reimagined access management with the project would create left turn lanes and possibly combine/reduce the numerous driveway entrances/exits off of the corridor."

Map

Coordinates:Erioll world.svg.png 38°01′33″N 78°30′59″W / 38.025928°N 78.516453°W / 38.025928; -78.516453

References

  1. Web. East High Streetscape Improvements, Virginia Department of Transportation, retrieved February 16, 2016.
  2. Web. Neighborhood Development Services - Projects Update to City Council, Department of Neighborhood Development Services, Septmber 2019, retrieved November 11, 2019.
  3. Web. Charlottesville lining up funding for bike, pedestrian projects, Sean Tubbs, Charlottesville Tomorrow, September 14, 2015, retrieved February 16, 2016.
  4. Web. State transportation panel to vote on Charlottesville streetscape projects, Charlottesville Tomorrow, June 13, 2016, retrieved October 24, 2016.
  5. Web. Council moves forward on streetscape projects, Sean Tubbs, News Article, Charlottesville Tomorrow, January 3, 2017, retrieved November 26, 2017.