Difference between revisions of "File:19881200-29Bypass-PHASE I HISTORIC ARCHITECTURE SURVEY.pdf"

From Cvillepedia
Jump to: navigation, search
(Route 29 Corridor Study: Phase 1 Historic Architecture Survey December 1988 Provided to Charlottesville Tomorrow by VDOT on July 1, 2011 in response to FOIA request Category:Western Bypass Studies)
 
m (Summary)
 
Line 5: Line 5:
  
 
Provided to Charlottesville Tomorrow by VDOT on July 1, 2011 in response to FOIA request
 
Provided to Charlottesville Tomorrow by VDOT on July 1, 2011 in response to FOIA request
 +
{{DEFAULTSORT:19881200-29Bypass-PHASE I HISTORIC ARCHITECTURE SURVEY}}
 +
[[Category:Western Bypass Studies]]
  
[[Category:Western Bypass Studies]]
 
 
== Licensing ==
 
== Licensing ==
 
{{self|cc-by-sa-3.0}}
 
{{self|cc-by-sa-3.0}}

Latest revision as of 12:37, 6 July 2011

Summary

Route 29 Corridor Study: Phase 1 Historic Architecture Survey

December 1988

Provided to Charlottesville Tomorrow by VDOT on July 1, 2011 in response to FOIA request

Licensing


I, the copyright holder of this work, hereby publish it under the following license:

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeDimensionsUserComment
current12:33, 6 July 2011 (46.86 MB)1099047208 (talk | contribs)Route 29 Corridor Study: Phase 1 Historic Architecture Survey December 1988 Provided to Charlottesville Tomorrow by VDOT on July 1, 2011 in response to FOIA request Category:Western Bypass Studies
  • You cannot overwrite this file.

There are no pages that link to this file.