File:19881200-29Bypass-PHASE I HISTORIC ARCHITECTURE SURVEY.pdf: Difference between revisions
Jump to navigation
Jump to search
1099047208 (talk | contribs) (Route 29 Corridor Study: Phase 1 Historic Architecture Survey December 1988 Provided to Charlottesville Tomorrow by VDOT on July 1, 2011 in response to FOIA request Category:Western Bypass Studies) |
1099047208 (talk | contribs) m (→Summary) |
||
Line 5: | Line 5: | ||
Provided to Charlottesville Tomorrow by VDOT on July 1, 2011 in response to FOIA request | Provided to Charlottesville Tomorrow by VDOT on July 1, 2011 in response to FOIA request | ||
{{DEFAULTSORT:19881200-29Bypass-PHASE I HISTORIC ARCHITECTURE SURVEY}} | |||
[[Category:Western Bypass Studies]] | |||
== Licensing == | == Licensing == | ||
{{self|cc-by-sa-3.0}} | {{self|cc-by-sa-3.0}} |
Latest revision as of 12:37, 6 July 2011
Summary
Route 29 Corridor Study: Phase 1 Historic Architecture Survey
December 1988
Provided to Charlottesville Tomorrow by VDOT on July 1, 2011 in response to FOIA request
Licensing
|
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Dimensions | User | Comment | |
---|---|---|---|---|
current | 12:33, 6 July 2011 | (46.86 MB) | 1099047208 (talk | contribs) | Route 29 Corridor Study: Phase 1 Historic Architecture Survey December 1988 Provided to Charlottesville Tomorrow by VDOT on July 1, 2011 in response to FOIA request Category:Western Bypass Studies |
You cannot overwrite this file.
File usage
There are no pages that use this file.