Fifth Street Extended Bicycle and Pedestrian Improvements: Afton Pond Court to Ambrose Commons Drive: Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
(created)
 
No edit summary
Line 1: Line 1:
{{Infobox Transportation
{{Infobox Transportation
| name = {{pagename}}
| name = {{PAGENAME}}
| photo =
| photo =
| caption =
| caption =

Revision as of 13:23, 30 May 2022



Fifth Street Extended Bicycle and Pedestrian Improvements: Afton Pond Court to Ambrose Commons Drive

Proposed

Project Overview
Location Albemarle County
Sponsor Albemarle County

Status Update

Fifth Street Extended Bicycle and Pedestrian Improvements: Afton Pond Court to Ambrose Commons Drive is a candidate project in the fifth round of the Smart Scale funding process administered by the Virginia Department of Transportation. [1]


Logo-small25.jpg This article is a stub. You can help cvillepedia by expanding it.


Project description

"This project would extend the shared-use path proposed by the Albemarle Business Campus development to the north and south to create a continuous facility on the west side of 5th Street/Old Lynchburg Road from Ambrose Commons to Afton Pond Court (Stagecoach Rd). A two-stage pedestrian crossing near Hickory Street would be included. The project would include a road diet (single lane for each travel direction and a center turn lane) from the previously funded roundabout at the Old Lynchburg/5th Street/County Office Building intersection to Ambrose commons."[1]

References

  1. 1.0 1.1 Web. Descriptions of Smart Scale Applications in Albemarle County, Albemarle County, retrieved May 30, 2022.

External Links