Eastern Connector Study Steering Committee

From Cvillepedia
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.


Streetcar-photo-sim.jpg This Transportation-related article is a stub. You can help cvillepedia by expanding it.

The Eastern Connector Study Steering Committee was created to help the firm PBS&J as it conducted a study of potential alternatives for the proposed Eastern Connector.

Purpose

The committee's directive was "to determine a minimum of three alternative alignments that will provide a connection between US 250 east of Route 20 and US 29 North between Rio Road and Profit Road. Study shall provide a thorough assessment of issues related to each alignment and a recommendation on preferred alignment based on analysis and direction provided during project.[1].

Members

References