Eastern Connector Study Steering Committee

From Cvillepedia
Revision as of 14:20, 14 July 2009 by B.S. Lawrence (talk | contribs) (cat, missing ref section, fixing non-specific URL)
Jump to navigation Jump to search


Logo-small25.jpg This article is a stub. You can help cvillepedia by expanding it.

The Eastern Connector Study Steering Committee was created to help the firm PBS&J as it conducted a study of potential alternatives for the proposed Eastern Connector.

Purpose

The committee's directive was "to determine a minimum of three alternative alignments that will provide a connection between US 250 east of Route 20 and US 29 North between Rio Road and Profit Road. Study shall provide a thorough assessment of issues related to each alignment and a recommendation on preferred alignment based on analysis and direction provided during project.[1].

Members

References