Eastern Connector Study Steering Committee

From Cvillepedia
Revision as of 16:49, 6 July 2009 by Seantubbs (talk | contribs) (New page: {{stub}} The Eastern Connector Study Steering Committee was created to help the firm PBS&J as it conducted a study of potential alternatives for the proposed Eastern Connector. =...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search


Logo-small25.jpg This article is a stub. You can help cvillepedia by expanding it.

The Eastern Connector Study Steering Committee was created to help the firm PBS&J as it conducted a study of potential alternatives for the proposed Eastern Connector.

Purpose

The committee's directive was "to determine a minimum of three alternative alignments that will provide a connection between US 250 east of Route 20 and US 29 North between Rio Road and Profit Road. Study shall provide a thorough assessment of issues related to each alignment and a recommendation on preferred alignment based on analysis and direction provided during project.[1].

Members

  • Ken Boyd, Albemarle County Board of Supervisors
  • Kevin Lynch, Charlottesville City Council (until Dec. 31, 2007)
  • Mark Graham, Director, Department of Community Development, Albemarle County
  • Juandiego Wade, Transportation Planner, Albemarle County
  • Cal Morris, Albemarle County Planning Commission
  • George Emmitt, Citizen representative for Albemarle County
  • John Pfaltz, Citizen representative for Charlottesville


Meeting dates

  1. "ALBEMARLE COUNTY COMMUNITY DEVELOPMENT EASTERN CONNECTOR CORRIDOR STUDY." Albemarle County. Albemarle County, n.d. Web. 6 July 2009. <http://www.albemarle.org/>.