Eastern Connector Study Steering Committee: Difference between revisions

From Cvillepedia
Jump to navigation Jump to search
m (transport stub)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{stub}}
{{transport-stub}}
The Eastern Connector Study Steering Committee was created to help the firm [[PBS&J]] as it conducted a study of potential alternatives for the proposed [[Eastern Connector]].  
The [[Eastern Connector Study Steering Committee]] was created to help the firm [[PBS&J]] as it conducted a study of potential alternatives for the proposed [[Eastern Connector]].  


==Purpose==
==Purpose==
The committee's directive was "to determine a minimum of three alternative
The committee's directive was "to determine a minimum of three alternative alignments that will provide a connection between US 250 east of Route 20 and US 29 North between Rio Road and Profit Road. Study shall provide a thorough assessment of issues related to each alignment and a recommendation on preferred alignment based on analysis and direction provided during project.<ref>[http://www.albemarle.org/department.asp?department=planning&relpage=9606 "ALBEMARLE COUNTY COMMUNITY DEVELOPMENT EASTERN CONNECTOR CORRIDOR STUDY."] Albemarle County. retrieved 14 July 2009.</ref>.
alignments that will provide a connection between US 250 east of Route 20 and US 29
North between Rio Road and Profit Road. Study shall provide a thorough assessment of
issues related to each alignment and a recommendation on preferred alignment based on
analysis and direction provided during project.<ref>"ALBEMARLE COUNTY COMMUNITY DEVELOPMENT EASTERN CONNECTOR CORRIDOR STUDY." Albemarle County. Albemarle County, n.d. Web. 6 July 2009. <http://www.albemarle.org/>.</ref>.


==Members==
==Members==
Line 18: Line 14:
*[[John Pfaltz]], Citizen representative for Charlottesville
*[[John Pfaltz]], Citizen representative for Charlottesville


==Meeting dates==
==References==
<references/>
 
[[Category:Transportation studies]]

Latest revision as of 20:03, 2 November 2009


Streetcar-photo-sim.jpg This Transportation-related article is a stub. You can help cvillepedia by expanding it.

The Eastern Connector Study Steering Committee was created to help the firm PBS&J as it conducted a study of potential alternatives for the proposed Eastern Connector.

Purpose

The committee's directive was "to determine a minimum of three alternative alignments that will provide a connection between US 250 east of Route 20 and US 29 North between Rio Road and Profit Road. Study shall provide a thorough assessment of issues related to each alignment and a recommendation on preferred alignment based on analysis and direction provided during project.[1].

Members

References