Lardner Klein Landscape Architects design study
Jump to navigation
Jump to search
In 1994, the city, county and the University of Virginia hired Lardner Klein Landscape Architects to conduct a design study for the Ivy Road corridor. [1]
This article is a stub. You can help cvillepedia by expanding it. |
Recommendations
County of Albemarle Proposed improvements from LK Study
- Establish the Ivy Road Design Study as a reference document.
- Review all site plans submitted according to recommendations of Ivy Road Design Study.
- Monitor the Western Bypass and the related impacts to Ivy Road.
- Establish a recognition program to call attention to the LH plan.
- Encourage all plantings on private property to adhere to plan.
- Modify the CATS/UNJAM for desired cross section.
- Acknowledge that this plan can only be achieved with joint effort between private/public sectors of community.
- Request grant funding through the SBA or ISTEA for railroad embankment planting.
- Enter lease agreement with CSX for maintenance of r-o-w between Old Ivy Road and Route 29/250 Bypass.
- Obtain permit from VDOT to allow plantings on their r-o-w.
- Construct the proposed long term plan in conjunction with VDOT (bike lanes, raised median, etc as detailed on page 41)
Improvements of above as of May 2008
- Item 1: The Study was adopted as part of Comprehensive Plan. The Study is referenced in the Land Use component of the Comprehensive Plan in the Profiles for Neighborhood Six and Seven.
- Item 2: Development proposals can be and are reviewed in regard to the Ivy Road Study recommendations. Specifically, Site Plan reviews are ministerial acts and the only improvements that can be required are those by the site plan ordinance based on the property zoning. The Commission cannot deny a site plan because it does meet the recommendations of the Comprehensive Plan.
- Item 3: Addressed when the Western Bypass was an active project.
- Item 6: The UnJam Plan describes the Route 250 West project (listed as I-24) as: improve roadway safe to include restriping to accommodate new sidewalk and bike lanes. UnJam also recognizes the road cross-section as a 3-lane urban design (center turn lane).
- Item 7: Completed.
References
- ↑ Web. Ivy Road Improvement Study: PACC Report, University of Virginia Office of the Architect for the University, May 2008, retrieved January 11, 2015.